Information

  • PSS Sub-Contractor Inspection

  • Conducted on

  • Document No.

  • Expectations:

    It is a requirement under the Management of Health and Safety at Work Regulations 1999 that a Risk Assessment is completed for every task, this is done before a job is started.
    This will be separate to any site specific inductions that may be required.
    The Contracts / Operations Manager / Supervisor / Coordinator will complete the audit on the relevant contractor in full and all evidence that is collected such as photos and comments made by customers will be documented.

  • What are your obligations under Legislation / PSS Policy?

    Under Legislation, as a subcontractor working for PSS you are considered a worker, but you may also be considered as an employer / PCBU (person conducting a business or undertaking) if you are engaging others to perform work for you. As such, you may have more than one “primary duty of care”:
    • As a worker, your primary duty of care is to take reasonable care for your own health and safety and that of others who may be affected by you actions; to comply with any reasonable instruction given by PSS and to comply with relevant statutory law; and to cooperate with any reasonable PSS policy or procedure.
    • As an employer/PCBU your specific obligations regarding your duty of care also include to ensure, the health and safety of workers you have engaged to perform work, including the provision of a safe working environment, safe plant and structures, safe systems of work, workplace monitoring, information, training, instruction, supervision, safe use, handling and storage of plant structures and substances, and facilities for workers welfare.

  • Any hazards that cause a residual risk rating of high or extreme (Per the Risk Calculator in the Procedures Manual / Subcontractor ID Badge) must be reported to the Operations Coordinator / manager immediately prior to commencing work. The Operations Coordinator / manager will then advise of the control measures that may be used, or an alternative method of work, or may close off the job until the identified hazard can be appropriately controlled. A copy of the completed assessment must be emailed to the Operations Coordinator or Operations Manager on completion of the assigned job. (Tick the box agreeing to this statement)

  • PSS Staff: Sign here to agree to the above conditions:

  • PSS Contractor: Sign here to agree to the above conditions:

  • Contractor Name:

Customer Details:

  • Customer Name / Job Site:

  • Type Address or Press Locate:
  • Date:

Risk Assessment:

  • Hazards:

  • Controls:

  • Residual Risk Level:

  • Signature:

General Safety:

  • Has the contractor consulted with the on site contact / PSS Manager and gained consent for the proposed work to be carried out?

  • Were they required to complete a Site Specific Induction?

  • Can they explain why a Site Specific Induction was not required?

  • Explain why the on site contact / PSS Manager was not consulted?

  • Does the contractor have a copy of the RAMS, COSHH assessments, permit to work and MSDS forms available on tablet, mobile device or a hard copy.

  • Is the method statement procedure reflected in the work practice?

  • Was a Risk Assessment carried out before the Inspection began?

  • Explain why a Risk Assessment was not carried out?

  • Please ensure that the contractor asks the relevant competent person for the missing paperwork before commencing with work

  • Does the contractor have all necessary PPE to do the proposed work safely

  • Were all safety procedures followed

  • Can they explain why some safety procedures were not followed?

  • Please ensure work stops until the correct PPE is available

  • Are Safety Barriers used to create an Exclusion Zone around the area of work?

  • Photo of Exclusion Zone (Mandatory)

  • Can the contractor explain why they did not use any Safety Barriers to create an Exclusion Zone in the area of work.

Height Safety

  • Will the contractor access the roof on this job?

  • Did they wear a Harness on this site?

  • List the PPE used with the Harness

  • Photo of Anchor point (Mandatory)

  • Has the Harness been inspected in the last 6 months

  • Is the Harness in good condition

  • Has the Harness been inspected by a competent person

  • Ensure the Harness is inspected appropriately

  • Select Response why Harness not used

  • Will the contractor being using a cradle on this job?

  • Has the contractor seen the most up to date inspection record of the cradle?

  • Can the contractor explain why? If reasoning is not adequate, please cancel job until inspection is seen.

Ladder Safety

  • Is a Ladder used on this job?

  • Will the Ladder be secured & is it appropriate for the task?

  • Will the Ladder extend 900mm past the landing

  • Will the contractor have 3 points of contact while using the Ladder?

  • Explain why the contractor will not have 3 points of contact while using the Ladder?

  • Select response why The Ladder did not extend 900mm past the landing?

  • Select response why the Ladder is not secured?

  • Is the Ladder in good condition?

  • Has the ladder got relevant inspection records

  • Photo of the Ladder secured (Mandatory)

Electrical Safety

  • Were Power Tools Used

  • Do the power tools have current Tag & Test dates

  • Have the power tools Tagged and Tested

  • Was an RCD used

  • Was the power box locked out

  • Photo of Lock out Tag

HS compliance

  • Is a First Aid Kit available?

  • It is best practice to carry a First Aid Kit, please ensure that it is kept available on all jobs from this point onwards

  • Does the contractor have a Fire Extinguisher in their vehicle?

  • It is mandatory to carry a Fire Extinguisher in the vehicle, please ensure that from this point onwards one is always available.

  • Does the contractor have an ID badge

Photos (Select yes or N/A that you have taken all mandatory photos)

  • Photo of Anchor Point

  • Photo of Ladder Secured

  • Photo of Barrier or Exclusion Zone

  • Photo of Work Order

At Completion of Job

  • Has the permit to work been signed on completion of the work.

  • Why has the permit to work not been signed?

  • Has the contractor left the worksite in an appropriate condition free from hazards and risks? (Clean up, tools put away, housekeeping ect)

  • List the hazards that have been created and what has been done to leave the site safe?

Sign-Off

  • Subcontractor Signature

  • PSS Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.