Inspection
Substation Earthing Systems
Is the work order for more than one Substation?
Substation tested.
- S01-A0160
- S02-L0037
- S03-J0030
- S04-L0041
- S05-A0141
- S06-P
- S07-P
- S08-C0028
Visual inspection of earthing system.
Testing Method Used.
Resistance reading in Ohms:
Substation tested.
- S01-A0160
- S02-L0037
- S03-J0030
- S04-L0041
- S05-A0141
- S06-P
- S07-P
- S08-C0028
Visual inspection of earthing system.
Testing Method Used.
Resistance reading in Ohms: