Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Have all team members carried out company/site induction and hold a white card?
-
Are all team members on site wearing the required PPE.
-
Have you referred to the applicable Proplumb SWMS?<br>
-
Does the SWMS cover all risks associated with the job to be undertaken? (if no complete risk assessment before proceeding)
Pre Start checks.
-
Is the site free from damage or vandalism? Eg. Smashed windows, graffiti etc.
-
Is the water lead in visible?
-
Is the ORG charged by a fixture or a waste?
-
If NO, is there a garden tap or PTR valve positioned to charge the ORG?
-
Are all shower boxes 300mm deep with the slab boxed out 150mm either side of centre?
-
Are a downpipe risers above ground and in the correct position?
-
Is the I.S shaft up and free of damage?
-
Is the S/W overflow up and free from damage?
-
Is the water tapping complete and in good condition?
-
Are you able to install the solar panel/s today?
-
Have you got sufficient material and all tools required to compete the job?
-
Has the roof been installed, if so can all roof flashing be installed today?
-
Does this house have recycled water?
-
The above information is true and correct.