Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Have all team members carried out company/site induction and hold a white card?
-
Are all team members on site wearing the required PPE.
-
Have you referred to the applicable Proplumb SWMS?<br>
-
Does the SWMS cover all risks associated with the job to be undertaken? (if no complete risk assessment before proceeding)
Pre Start checks.
-
Is the site free from damage or vandalism? Eg. Smashed windows, graffiti etc.
-
Has the solar panel been installed?
-
Have all shower bases been installed (by carpenter) and ready to be connected?
-
Have all baths been installed (by carpenter) and ready to be connected?
-
If there is a verandah, is it ready for flashing?
-
If there are lead gables, is the gap between the end of the tile and truss less then 75mm?
-
Have you got all the wall mixers required for the job?
-
Is the I.S shaft up and free from damage?
-
Is the S/W overflow up and free from damage?
-
Is the water tapping complete and in good condition?
-
Have you got sufficient material and tools required to finish the job?
-
Are all the sewer risers in the correct position and don't need to be jackhammered?
-
The above information is true and correct.