Information
-
Job Number
-
Client
-
Site Address
-
Inspection Date & Time
-
Checked By
CHECKLIST
GENERAL
-
Water on
-
Power on
-
Gas on
GARAGE
-
Garage door/s working with all remotes
-
Garage door head is tidy
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Floor clean
-
Paintwork is completed to a high standard
-
Ceiling hatch installed correctly<br>(May be in hallway)
-
Light fittings are clean and free of damage
-
Fibre hub is fitted off
-
Water valve cover is clean and free of damage
-
General
LAUNDRY
-
HWC installed and hot water running
-
HWC restraints fitted
-
Linen cupboard shelving installed securely
-
Laundry tub installed and taps working
-
Lights all working
-
Power points installed correctly
-
There is a power point for appliances
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Light fittings are clean and free of damage
-
Laundry tub is sealed to wall
-
General
ENTRY
-
Front door/s working freely
-
Front door hardware fitted correctly
-
Floor coverings are complete
-
Lights all working
-
Power points all working
-
Paintwork is completed to a high standard
-
Light fittings are clean and free of damage
-
General
HALLWAY
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Light fittings are clean and free of damage
-
General
KITCHEN
-
Wall oven operational
-
Cooktop operational
-
Dishwasher operational
-
Rangehood operational
-
Waste disposal operational (air switch)
-
Tap ware operational
-
Soft close drawers are working
-
Lights all working
-
Power points all working
-
Cut outs for waste etc are tidy
-
Splash back is completed and tidy
-
All cabinetry doors and drawers aligned and work freely
-
All cabinetry handles are level
-
Bench top/s are free from any damage
-
Cabinetry toe-kicks are free from damage
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
WIP door works freely and door handle fitted correctly
-
Light fittings are clean and free of damage
-
General
DINING ROOM
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Light fittings are clean and free of damage
-
General
FAMILY ROOM
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Light fittings are clean and free of damage
-
General
LIVING ROOM
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Light fittings are clean and free of damage
-
General
STUDY
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Wardrobe shelves fitted correctly
-
Wardrobe rails fitted correctly
-
Light fittings are clean and free of damage
-
General
BATHROOM
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Toilet installed correctly and free of damage
-
Toilet seat operational
-
Vanity installed correctly and free of damage
-
Vanity plug supplied
-
Tapware operational
-
Towel rail fixed to wall correctly
-
Towel rail connected to power
-
Bath installed correctly and free of damage
-
Bath plug supplied
-
Shower installed correctly and free of damage
-
Shower door operational and free of damage
-
Shower shelf installed correctly
-
Shower liner/tiles sealed to wall
-
Mirror installed and free of damage
-
Light fittings are clean and free of damage
-
Toilet roll holder has been installed and is fixed to wall correctly
-
General
WC
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Toilet installed correctly and free of damage
-
Toilet seat operational
-
Basin installed correctly and free of damage
-
Basin plug supplied
-
Tapware operational
-
Towel rail fixed to wall correctly
-
Mirror installed and free of damage
-
Light fittings are clean and free of damage
-
Toilet roll holder has been installed and is fixed to wall correctly
-
General
MASTER BEDROOM
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Light fittings are clean and free of damage
-
General
ENSUITE
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Toilet installed correctly and free of damage
-
Toilet seat operational
-
Vanity installed correctly and free of damage
-
Vanity plug supplied
-
Tapware operational
-
Towel rail fixed to wall correctly
-
Towel rail connected to power
-
Bath installed correctly and free of damage
-
Bath plug supplied
-
Shower installed correctly and free of damage
-
Shower door operational and free of damage
-
Shower shelf installed correctly
-
Shower liner/tiles sealed to wall
-
Mirror installed and free of damage
-
Light fittings are clean and free of damage
-
Toilet roll holder has been installed and is fixed to wall correctly
-
General
WALK IN ROBE
-
Lights all working
-
Power points installed correctly
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Shelves fitted correctly
-
Rails fitted correctly
-
Light fittings are clean and free of damage
-
General
BEDROOM 2
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Wardrobe shelves fitted correctly
-
Wardrobe rails fitted correctly
-
Light fittings are clean and free of damage
-
General
BEDROOM 3
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Wardrobe shelves fitted correctly
-
Wardrobe rails fitted correctly
-
Light fittings are clean and free of damage
-
General
BEDROOM 4
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Wardrobe shelves fitted correctly
-
Wardrobe rails fitted correctly
-
Light fittings are clean and free of damage
-
General
OTHER
-
Lights all working
-
Power points installed correctly
-
Windows working freely
-
Doors working freely
-
Door hardware fitted correctly
-
Paintwork is completed to a high standard
-
Floor coverings are complete
-
Light fittings are clean and free of damage
EXTERIOR ITEMS
-
Downpipes are secure and installed correctly
-
Flashings are complete
-
ORG’s are haunched
-
Correct amount of cesspits have been installed as per BC plan
-
Cladding is complete
-
Soffits are clean and free of damage
-
Garage door jamb has been sealed underneath
-
Fascia soakers are installed correctly (fascia to cladding)