Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Date and time of inspection

  • Check Pressure Drop Reading, Normal range is 1-6 inches

  • Please enter reading and any comments

  • Filter change necessary:

  • Enter date and time of filter change.

  • Comments

  • Gauges reading properly to last calibration standard

  • Comments

  • Cleaning system functioning properly at weekly inspection

  • Comments

  • Hopper discharge: Discharging correctly, material buildup:

  • Comments

  • Visible stack emissions:

  • Comments

  • Structural integrity: signs of fatigue and excessive corrosion:

  • Comments

  • Ductwork: must be intact and free of damage:

  • Comments

  • Housekeeping around dust collector: action needed?

  • Comments

  • Inspection completed by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.