Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Date and time of inspection
-
Check Pressure Drop Reading, Normal range is 1-6 inches
- yes
- no
-
Please enter reading and any comments
-
Filter change necessary:
- yes
- no
-
Enter date and time of filter change.
-
Comments
-
Gauges reading properly to last calibration standard
- yes
- no
-
Comments
-
Cleaning system functioning properly at weekly inspection
- yes
- no
-
Comments
-
Hopper discharge: Discharging correctly, material buildup:
- yes
- no
-
Comments
-
Visible stack emissions:
- yes
- no
-
Comments
-
Structural integrity: signs of fatigue and excessive corrosion:
- yes
- no
-
Comments
-
Ductwork: must be intact and free of damage:
- yes
- no
-
Comments
-
Housekeeping around dust collector: action needed?
- yes
- no
-
Comments
-
Inspection completed by: