Title Page
-
Apartment Number
-
Conducted on
-
Prepared by
Lighting
-
Are all light fittings installed?
-
Are all lights controlled?
-
Have all lights been addressed?
-
Are all lights in the correct groups?
-
Is the lighting section complete?
Processor
-
Has the correct lighting program been uploaded to slot 1?
-
Has the correct AV program been uploaded to slot 2?
-
Has the correct HVAC program been uploaded to slot 3?
-
Is the time and date correct on the processor?
-
Is the processor section complete?
Keypads
-
Are all keypads installed and fixed to the wall in the correct locations?
-
Are all keypads damage free? if no, please take a picture to show damage
-
Are all keypads powered and addressed correctly?
-
Press button 1 up, does this recall scene 1?
-
Press button 1 down, does this recall scene 2?
-
Press button 2 up, does this recall scene 3?
-
Press button 2 down, does this turn off all room lights?
-
Press button 3 up, this is for future blind operation
-
Press button 3 down, this is for future blind operation
-
Press and hold button 3 up, this will raise all lights
-
Press and hold button 3 down, this will lower all lights
-
By the front door only, press and hold button 1 up, this will turn on all lights in the apartment
-
By the front door only, press and hold button 2 down, this will turn off all lights in the apartment
-
Is the keypad section complete?
Touchpanel
-
Are the touch panel(s) installed?
-
Is the touch panel powered and connected to the processor?
-
Is the touch panel damage free? if no, please take a picture to show damage
-
Does the touch panel control the correct areas?
-
Is the touch panel section complete?
Doorbell
-
Has the doorbell cable been terminated in the LCP?
-
Does the doorbell ring the touchpanel?
-
Is the doorbell section complete?
HVAC
-
Has the network cable been connected to the switch?
-
Is the HVAC showing as online on the touch panel?
-
Do all areas control correctly with 2 way control?
-
Is the HVAC section complete?
Notes / Comments
-
Please enter any notes or comments here
Sign Off
-
Smartcomm Commissioning Engineer
-
I confirm that the above checks have been carried out and everything is fully commissioned.
-
Core Group
-
I confirm by signing below that this apartment is fully commissioned by Smartcomm Ltd. Any further works to be carried out in this apartment will be subject to a call out fee and instruction to proceed.
-
Other Signature if required
-
Please enter name of company
-
Add signature