Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

Kitchen Inspection

  • Kitchen 1

1.00 Kitchen 1

  • 1.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 1.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 1.03 Have all fillers been installed correctly?

  • 1.04 Finished fronts are neat, joins cleaned and overhand gables?

  • 1.05 Have kickboards been fitted correctly? (i.e do not flex)

  • 1.06 Benchtop joins are neat / clean and to Australian standards?

  • 1.07 Have the headers / scotia been fitted correctly?

  • 1.08 Has the sink been sealed off or left on site for install by other trade?

  • 1.09 The sink is free of scratches and damage?

  • 1.10 Have all adjustable shelves been installed?

  • 1.11 Are all handles installed neat and level

  • 1.12 Are all screws capped?

  • 1.13 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 1.14 Is the cutout for the cooktop correct, neat and sealed?

  • 1.15 Are oven fascias installed and oven bearers glued down?

  • 1.16 Is the dishwasher fascia / full top installed?

  • 1.17 Are holes drilled for the dishwasher cable and pipes, with cable outlets glued in place?

  • 1.18 Have all accessories and the cutlery tray been installed? (strip lighting)

  • 1.19 Has all hardware been fitted correctly? (gallery rails)

  • 1.20 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 1.21 Has all waste been placed in designated area?

  • 1.22 Has the work area been swept?

  • 1.23 Photos taken of any uninstalled joinery or defects.

  • Kitchen 2

2.00 Kitchen 2

  • 2.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 2.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 2.03 Have all fillers been installed correctly?

  • 2.04 Finished fronts are neat, joins cleaned and overhand gables?

  • 2.05 Have kickboards been fitted correctly? (i.e do not flex)

  • 2.06 Benchtop joins are neat / clean and to Australian standards?

  • 2.07 Have the headers / scotia been fitted correctly?

  • 2.08 Has the sink been sealed off or left on site for install by other trade?

  • 2.09 Is the sink scratched or damaged?

  • 2.10 Have all adjustable shelves been installed?

  • 2.11 Are all handles installed neat and level

  • 2.12 Are all screws capped?

  • 2.13 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 2.14 Is the cutout for the cooktop correct, neat and sealed?

  • 2.15 Are oven fascias installed and oven bearers glued down?

  • 2.16 Is the dishwasher fascia / full top installed?

  • 2.17 Are holes drilled for the dishwasher cable and pipes, with cable outlets glued in place?

  • 2.18 Have all accessories and the cutlery tray been installed? (strip lighting)

  • 2.19 Has all hardware been fitted correctly? (gallery rails)

  • 2.20 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 2.21 Has all waste been placed in designated area?

  • 2.22 Has the work area been swept?

  • 2.23 Photos taken of any uninstalled joinery or defects.

  • 3.0 Bathroom / Ensuite 1

3.0 Bathroom / Ensuite 1

  • 3.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 3.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 3.03 Have all fillers been installed correctly?

  • 3.04 Have kickboards been fitted correctly? (i.e do not flex)

  • 3.05 Benchtop joins are neat / clean and to Australian standards?

  • 3.06 Have the headers / scotia been fitted correctly?

  • 3.07 Have the basins been sealed off or left on site for install by other trade?

  • 3.08 Are the basins scratched or damaged?

  • 3.09 Have all adjustable shelves been installed?

  • 3.10 Are all handles installed neat and level

  • 3.11 Are all screws capped?

  • 3.12 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 3.13 Has all hardware been fitted correctly? (gallery rails)

  • 3.14 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 3.15 Has all waste been placed in designated area?

  • 3.16 Has the work area been swept?

  • 3.17 Photos taken of any uninstalled joinery or defects.

  • 4.0 Bathroom / Ensuite 2

4.0 Bathroom / Ensuite 2

  • 4.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 4.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 4.03 Have all fillers been installed correctly?

  • 4.04 Have kickboards been fitted correctly? (i.e do not flex)

  • 4.05 Benchtop joins are neat / clean and to Australian standards?

  • 4.06 Have the headers / scotia been fitted correctly?

  • 4.07 Have the basins been sealed off or left on site for install by other trade?

  • 4.08 Are the basins scratched or damaged?

  • 4.09 Have all adjustable shelves been installed?

  • 4.10 Are all handles installed neat and level

  • 4.11 Are all screws capped?

  • 4.12 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 4.13 Has all hardware been fitted correctly? (gallery rails)

  • 4.14 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 4.15 Has all waste been placed in designated area?

  • 4.16 Has the work area been swept?

  • 4.17 Photos taken of any uninstalled joinery or defects.

  • 5.0 Bathroom / Ensuite 3

5.0 Bathroom / Ensuite 3

  • 5.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 5.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 5.03 Have all fillers been installed correctly?

  • 5.04 Have kickboards been fitted correctly? (i.e do not flex)

  • 5.05 Benchtop joins are neat / clean and to Australian standards?

  • 5.06 Have the headers / scotia been fitted correctly?

  • 5.07 Have the basins been sealed off or left on site for install by other trade?

  • 5.08 Are the basins scratched or damaged?

  • 5.09 Have all adjustable shelves been installed?

  • 5.10 Are all handles installed neat and level

  • 5.11 Are all screws capped?

  • 5.12 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 5.13 Has all hardware been fitted correctly? (gallery rails)

  • 5.14 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 5.15 Has all waste been placed in designated area?

  • 5.16 Has the work area been swept?

  • 5.17 Photos taken of any uninstalled joinery or defects.

  • 6.0 Bathroom / Ensuite 4

6.0 Bathroom / Ensuite 4

  • 6.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 6.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 6.03 Have all fillers been installed correctly?

  • 6.04 Have kickboards been fitted correctly? (i.e do not flex)

  • 6.05 Benchtop joins are neat / clean and to Australian standards?

  • 6.06 Have the headers / scotia been fitted correctly?

  • 6.07 Have the basins been sealed off or left on site for install by other trade?

  • 6.08 Are the basins scratched or damaged?

  • 6.09 Have all adjustable shelves been installed?

  • 6.10 Are all handles installed neat and level

  • 6.11 Are all screws capped?

  • 6.12 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 6.13 Has all hardware been fitted correctly? (gallery rails)

  • 6.14 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 6.15 Has all waste been placed in designated area?

  • 6.16 Has the work area been swept?

  • 6.17 Photos taken of any uninstalled joinery or defects.

  • 7.0 Laundry 1

7.0 Laundry 1

  • 7.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 7.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 7.03 Have all fillers been installed correctly?

  • 7.04 Have kickboards been fitted correctly? (i.e do not flex)

  • 7.05 Benchtop joins are neat / clean and to Australian standards?

  • 7.06 Have the headers / scotia been fitted correctly?

  • 7.07 Has the tub been sealed off or left on site for install by other trade?

  • 7.08 Is the tub scratched or damaged?

  • 7.09 Have all adjustable shelves been installed?

  • 7.10 Are all handles installed neat and level

  • 7.11 Are all screws capped?

  • 7.12 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 7.13 Has all hardware been fitted correctly? (gallery rails)

  • 7.14 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 7.15 Has all waste been placed in designated area?

  • 7.16 Has the work area been swept?

  • 7.17 Photos taken of any uninstalled joinery or defects.

  • 8.0 Laundry 2

8.0 Laundry 2

  • 8.01 Have all cupboards been installed level and parallel with walls and cabinets?

  • 8.02 Have all doors / draws been adjusted for equal / even gaps? (check operation)

  • 8.03 Have all fillers been installed correctly?

  • 8.04 Have kickboards been fitted correctly? (i.e do not flex)

  • 8.05 Benchtop joins are neat / clean and to Australian standards?

  • 8.06 Have the headers / scotia been fitted correctly?

  • 8.07 Has the tub been sealed off or left on site for install by other trade?

  • 8.08 Is the tub scratched or damaged?

  • 8.09 Have all adjustable shelves been installed?

  • 8.10 Are all handles installed neat and level

  • 8.11 Are all screws capped?

  • 8.12 Are all benchtops and joinery neatly sealed off to walls or adjacent panels?

  • 8.13 Has all hardware been fitted correctly? (gallery rails)

  • 8.14 Have the cupboards been cleaned of labels, excess glue, sawdust and marks?

  • 8.15 Has all waste been placed in designated area?

  • 8.16 Has the work area been swept?

  • 8.17 Photos taken of any uninstalled joinery or defects.

9.00 Internal Use Only

  • 9.01 Can bench tops be installed? If yes contact lnstaller to book check measure

  • 9.02 Can all work be paid?

  • Comments

  • Site Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.