Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

BMS State

  • Is the system stable

Roof

  • Access to roof clear and no trip hazards

  • Weather Ok to proceed safely

  • If at night enough light to see safe passage

  • Doors locked before and after inspection

  • plant status Ok? Note if No

Lower ground south

  • Doors locked before and after inspection

  • HV switch room safe to enter has security been informed for Co2 isolation and de-isolation

  • Is room clean and no abnormal switch status or alarms

  • Lv switch room safe to enter has security been informed for Co2 isolation and de-isolation

  • 12hr pump room all Ok

  • Boiler house Ok ie in auto

Basement

  • Tx rooms

  • Water tank room all plant including 24hr pressurisation unit, tanks and pumps or any abnormal occourances

  • all plant including tanks and pumps report anything abnormal.

All areas up to Norland standards

  • Spill kits in place

  • Signage up to date, access ladders in date,

  • Any sign of outside interferance

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.