Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
BMS State
-
Is the system stable
Roof
-
Access to roof clear and no trip hazards
-
Weather Ok to proceed safely
-
If at night enough light to see safe passage
-
Doors locked before and after inspection
-
plant status Ok? Note if No
Lower ground south
-
Doors locked before and after inspection
-
HV switch room safe to enter has security been informed for Co2 isolation and de-isolation
-
Is room clean and no abnormal switch status or alarms
-
Lv switch room safe to enter has security been informed for Co2 isolation and de-isolation
-
12hr pump room all Ok
-
Boiler house Ok ie in auto
Basement
-
Tx rooms
-
Water tank room all plant including 24hr pressurisation unit, tanks and pumps or any abnormal occourances
-
all plant including tanks and pumps report anything abnormal.
All areas up to Norland standards
-
Spill kits in place
-
Signage up to date, access ladders in date,
-
Any sign of outside interferance