Title Page
-
Plenum Prep and Assembly
-
Prepared by
-
Location
Frame Fit Up
Station 4
-
The dimensions of all required components is correct to drawing?
-
Has the bed been made to meet brand standards?
-
Click "create action" and assign to the housekeeper responsible for this room
-
Take a photo of the bed
-
All parts are properly prepped for welding?
-
Take a photo of the fresh towels placed in the bathroom
-
The complete assembly is square?
-
All gussets are the correct thickness and welded in the correct location?
-
Take a photo of the mini bar
-
All welds are without defect and spatter has been removed?
-
Assembly has been correctly marked for identification with tag?
-
To my knowledge the above statements are accurate
Station 5
-
The dimensions of all required components is correct to drawing?
-
All parts are properly prepped for welding?
-
All gussets are the correct thickness and welded in the correct location?
-
All gusset welds are complete without defect?
-
All required holes are the correct size and location per the jig and by stacking of unit onto base frame?
-
All cross brace welds are at the proper end of the unit per print and complete without defect?
-
All spatter is removed, frame is ready for paint prep?
-
Assembly has been correctly marked for identification with tag?
Station 6
-
Assembly is clean and prepped, all dirt and spatter is removed?
-
Areas that don't require paint are masked off
-
Assembly is primed with the correct color and the required millage of primer?
-
Assembly has been correctly marked for identification with tag?
Station 7
-
The dimensions of all required components is correct to drawing?
-
If required, panels are insulated?
-
Inner skins are properly installed with no stripped fasteners or extra holes?
-
All panel gaps and offsets are within tolerance?
-
All openings are the correct size and square?
-
Doors and covers are installed with correct hardware and doors open and close with uniform gaps?
-
If required, wall panels are tack welded with no weld spatter and ready for final paint?
-
All required seams are caulked?
-
Assembly has been correctly marked for identification with tag?
Station 8
-
Assembly is clean and prepped, all dirt and spatter is removed?
-
Areas that don't require paint are masked off?
-
Assembly is painted the correct color with the required millage of paint?
-
Assembly has been correctly marked for identification with tag?
Station 9
-
The dimensions of all required components is correct to drawing?
-
If required, baffle is correctly assembled and assembly is square?
-
If required, saddle is correctly assembled and assembly is square?
-
If required, birdscreen is installed?
-
All welds are without defect and spatter has been removed?
-
Assembly has been correctly marked for identification with tag?