Title Page
-
Site conducted
-
Conducted on
-
Conducted by
-
PO Number
-
NI Number
Quality Check
BUILD LIST
-
STRUT
-
CONDUIT
-
CABLE TRAY
-
GROUND WIRE AND BONDING OF CABLE TRAY
-
AB PLC
-
BATTERY
-
LOAD CENTER
-
SIZE 1 STARTER
-
LVJB
-
JUNCTION
-
XFMR
-
60 AMMP DISC
-
100 AMP DISC
-
LIGHT
-
LIGHT/ GFI
-
PULLING WIRE
-
TERM OF PLC
-
TERM OF BATTERY
-
TERM OF LOAD CENTER
-
TERM OF STARTER
-
TERM OF LVJB
-
TERM OF JUNCTIONJN
-
TERM OF XFMR
-
TERM OF 60 AMP DISCONNECT
-
TERM OF 100 AMP DISCONNECT
-
TERM OF LIGHT
-
TERM OF LIGHT SWITCH/ GFCI
-
LABEL
-
LEGS
-
4 BATTERY
AB BACKPLANE
-
START DATE
-
USE BLUE TAPE TO PUT TECHS NAME ON BACKPLANE
-
CHECK THAT ALL COMPONENTS ARE INSTALLED PROPERLY
-
CHECK ALL TERMINATIONS
-
CHECK ALL TERMINALS BLOCKS ARE RIGHT SIDE UP AND HAVE FUSES
-
CHECK ALL TERMINATIONS ARE TIGHTENED PROPERLY
-
DO A PULL TEST
-
CHECK GENERAL CONDITION OF WIRE AND ZIP TIES ARE CUT.
-
TURKS INSTALL
-
CHECK ALL RED JUMPERS ARE INSTALLED PROPERLY
-
PRESENCE OF REQUIRED LABELS ON WIRES AND TERM BLOCKS
-
MAKE SURE PANDUIT COVERS ARE WITH BACKPLANE
-
MAKE SURE ROC EXPANSION COVERS ARE WITH THE PLC
-
TECH THAT BUILDS THE BACKPLANE DOES (POINT TO POINT)
-
DIFFERENT TECH DOES SECOUND ( POINT TO POINT)
-
MAKE SURE STAND OFF ARE INSTALLED
-
MAKE SURE YOU VACCUM OUT THE BACKPLANE
-
MAKE SURE LICENSE'S IS WITH THE PLC
-
SEBASTAIN FINAL SIGN OFF
-
END TIME