Start
-
Report title
-
Vessel
-
Conducted on
-
Conducted By
-
Master
-
Nautical Officer
1. Introduction
-
Introduction to nautical survey>
2. Publications, and records
-
Nautical Charts / Publications as per procedure 72-03 (Three Months)
-
Charts and publication Temporary corrections recorded_
-
Charts and publication subscription agreement posted on bridge.
-
Chart / Publication Inventory conducted and in PMS as per Procedures 72-03 (Three Months)
-
Chart and publication corrections and Backlog. See procedure 72-03 (Three Months)
-
ECD Charts, Last revision, up to date and installed correctly. Officer able to show compliance.
-
Voyage planning, Log books, record books and standing orders.
-
Passage Planning, Port to Port, waypoint list, publications charts and communication. Signed by master and officer.
-
Vessel movement recording in charts and log books according to SOLAS
-
Log Books / Standing Order / OOW procedures / Night order book
-
UK Vessel
-
Official Log Book. Safety officer recorded / Crew Agreement / Open less then one year ...
-
Bell book onboard and in use...
-
Compass book onboard and in use...
-
Manuals and instruction books.
3. Radio Station / GMDSS
-
GMDSS Records and Procedures
-
GMDSS service agreement, valid and posted.
-
GMDSS Log book in order, services recorded and signed by master.
-
GMDSS Battery room and Battery indication in order.
-
Antenna Plan posted and version correct.
-
VHFs and DSCs Status and tests recorded
-
VDR / S-VDR in order and no alarms. EMCY procedures posted.
-
VDR / S-VDR Annual test conducted and certificate onboard
-
MF-HF and DSC status and tests recorded
-
INMAR SAT C - Status and procedures
-
LRIT, Conformance test onboard and status of unit
-
Portable GMDSS VHFs. In order and tested. Spare batteries valid and in good condition. Test and expire dates in PMS.
-
SARTS - Testing recorded, Battery expire dates, in PMS
-
EPIRB - Status, Heating, Hydrostatic release expire.
-
Annual Testing, Certificate onboard
-
Battery Expire, last changed. in PMS.
-
Fleet 55 or 77 status
-
MOB Buoys, status and expire dates, In PMS.
-
Internal Communication.
-
V-Sat or online Communication.
4. Nautical bridge Equipment
-
Steering
-
Helm Switch / Override, Status
-
Steering gear procedures, instructions and posters.
-
EMCY Steering, Function tests, instructions and posters.
-
Steering and EMCY steering drills, records and PMS.
-
Rudder Indicators and repeters.
-
Test of off-course alarm, history, PMS
-
Auto Pilot status, function and tests.
-
Compasses
-
Main magnetic compass, Certification, status, in PMS.
-
Spare magnetic compass, Certification, status, in PMS.
-
Magnetic compass repeaters and and visible from helm position.
-
Deviation cure valid, status. compasses adjusted by approved adjuster.
-
Gyro compasses, status and in PMS
-
Gyro compass last service.
-
Gyro compass speed and latitude faults
-
Gyro compass repeaters and bearing sight devices.
-
Radars
-
X-Band Radar (3cm), Status, last service, Last Magnetron Changed. Service in PMS
-
S-Band Radar (10cm), Status, last service, Last Magnetron Changed. Service in PMS
-
Additional Radar, Status, last service, Last Magnetron Changed. Service in PMS
-
Scanners, Status, Service. In PMS
-
GPS / D-GPS Receivers, Status, Connections to other equipment. Service.
-
AIS status, annual inspection, Data updated in AIS, AIS in Checklist.
-
ECD system status.
-
Navlights
-
Nav Lights, Test of Alarms, EMCY Power, In PMS
-
NUC Lights, Test of Alarms, EMCY Power, In PMS
-
Echo Sounder, Status.
-
Speed log, status.
-
NAVTEX, Status programmed, and in checklist.
-
Weather instruments
-
Test of enclosed bridge sound system
-
Fog / Mist Horn system. Status.
-
Wheelhouse.
-
Maneuvers stands, Panels and ergonomics. Status and Testing.
-
Lamp and leaver testing. Status, in checklist or PMS
-
Gong Gong and ships bell
-
SEXTANT, Status
-
Binoculars, status
-
Bridge visibility, window wipers, heating, sun film etc.
-
Bridge ventilation AC/ Heating.
-
BNWAS, Status, testing recorded, in PMS.
-
Additional equipments or systems
5. SMS Procedures / checklists etc
-
EMCY Stop testing, ME, BOW-STEARN Thrusters, In PMS.
-
Use of Key Checklists. Departure, Arrival, Pilotage etc. and recording of the same.
-
Use of EMCY checklists. Lists posted.
-
Emergency Towing Booklet. 3 copies according to SMS.
-
Additional
6. Deficiencies
-
Identified Deficiencies.
No:
-
Deficiency / to be rectified before.
7. Conclusion
-
Report Summary
8. Attachements
-
Attachements
No: