Title Page

  • Document Number: RFML TG

  • Conducted on

  • Prepared by

  • Crew:

  • Forest / Farm

  • Compartment

  • Radio R/T Channel (used on site)

  • Emergency Location Point (ELP) description (eg: woolshed)

  • Emergency Location Point coordinates

  • Road (main access rd closest to site)

  • Site Specific Hazards / Prescription supplied by company. Document / ID No#

Pre-Start Daily Machine Check

  • Make/Model of Machine

  • Fire Extinguishers in and on Machine

  • Checked for oil leaks

  • Machine Greased

  • Machine Water & Oil Levels Checked

  • Machine checked for Debris

  • Radiator screen checked and / or Cleaned

  • Fuel 20m away from Waterway

Pre-Start Burn Check

  • Fire trailer on site

  • STOP. No Burn/Fire can be started without Fire Fighting Equipment onsite

  • All members of Burn crew have their PPE

  • Wajax pump & hoses set up and primed (ready to go)

  • Weather condition are suitable for Burn (refer to weather monitoring)

  • Vegetation around burn pit is deemed safe distance away from fire

  • Fire Sign is in place

PPE Check

    Person being Inspected
  • 1. Name

  • Hi Vis

  • Safety Boots

  • Helmet with neck flap

  • Eye protection

  • Gloves

RISK ASSESSMENT OF HAZARDS

  • Are current controls for known Hazards effective? If NO, reassess hazard below

  • RISK ASSESSMENT Rate any new hazards that are not in Rata Forestry's Risk Register. HAZARD
  • Hazard Type

  • INHERENT RISK

  • Consequence

  • Likelihood

  • Level

  • RISK CONTROLS

  • RESIDUAL RISK

  • Consequence

  • Likelihood

  • Level

  • Hierarchy of control

  • TRAFFIC MANAGEMENT
  • Traffic Plan Code

  • Road Traffic plan to be implemented on (name Rd)

  • Planned Date:

MEETING MINUTES

WORK PLAN - WHAT'S HAPPENING ON SITE TODAY

  • undefined

  • NAME & SIGNATURE
  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.