Title Page

  • Housing Authority Work Order Number

  • Complex Address
  • Conducted on

  • All replacement of light fittings, lamps, cabling and all electrical components must be recorded.

Location of Lamps to be replaced

  • Outside Unit/s

  • Driveway

  • Common Area (e.g Stairways, free standing carports)

  • Where possible provide photos of completed works

Location of replaced Light Fittings

  • Outside Unit/s

  • Driveway

  • Common Area (eg. Stairways, free standing carports)

  • Where possible provide photos of completed works

Location of replaced Cabling

  • Outside Unit/s

  • Driveway

  • Common Area (eg. Stairways, free standing carports)

  • Where possible provide photos of completed works

Location of replaced electrical components

  • PE Cell

  • Ballast

  • Contractor/switchgear

  • Where possible provide photos of completed works

Sign Off

  • Comments required on works completed and functionality of security lighting or in the case a of multistory complex the functionality of the circuits that are being worked on.

  • Where possible provide photos of completed works

  • Electrical Workers name and license number

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.