Information
-
Document No.
-
Job Title
-
Client:
- Other
- Abernethy Contractors
- Asplundh
- Asset Managers Ltd
- Asset Monitoring Ltd
- Auckland Racing
- Auckland Sandblasting Ltd
- Auckland Waikato Cranes
- Aurecon
- Bishman Electrical Contractors
- Canadian Pacific Ltd
- Cassidy Construction
- Civic Events
- Civil Con
- Coastline
- Concrete-it ltd
- ConTech
- Counties Sandblasting
- CSR NZ Ltd
- DP Construction
- Drill Force
- Electrix Ltd
- Euro Plumbing
- Filltech
- Filtration Technology Ltd
- Fletchers - Christchurch
- Fulton Hogan Ltd
- Geotechnics
- Gubb Builders
- HEB Construction Ltd
- Hill Design Engineering Ltd
- HydroTech Drainage
- ITC
- Leightons
- Lend Lease
- MACHINERY MOVERS
- Mainline Construction Ltd
- McConnell Dowell Constructors Ltd CHC
- McMillan and Lockwood BOP Ltd
- MWH Global
- NGA Newmarket
- NZ STRONG
- Opus
- Parallaxx Limited
- Peter Campbell Matakana
- Peter Hill
- Peter Lehman
- Pipeline & Civil
- Prestige Events Ltd
- R M Paris.Co
- Scarbro Construction
- Selen Kurmar
- Sherry - Private
- Skin Tight Ltd
- Steel Roofing Ltd
- Temporary Traffic Control Ltd
- The Fletcher Construction Company Ltd
- Tree Fellas
- Troy Wheeler Civil Ltd
- Watercare
- Your Local Plumber
-
Enter Client Name Here
-
Time of Job Start Form being completed
-
Prepared by
- Labour Hire
- Other
- Albert Heke
- Apa Vila
- Daniel Bishop
- David Bridgewater
- Eroni Baleilevuka
- Jasmin Alvarado
- John Maro
- Jordan MacDonald
- Josh Heke
- Kahu Sutherland
- Kelly Rebate
- Matai Vila
- Phillip Cooper
- Soul Suliasi Toa
- William Wilson
-
Enter Name Here
-
Location of Job
Daily Job Record
-
Description of Job
- Contraflow
- Full Closure
- Lane Closure
- Mobile
- Semi Static
- Shoulder Closed
- Stop/Go
- Other
-
Other
-
TMP Number
-
Job Number
-
Add Employees
Employees who worked on this job
-
Add Employees
- Labour Hire
- Other
- Albert Heke
- Apa Vila
- Daniel Bishop
- David Bridgewater
- Eroni Baleilevuka
- Jasmin Alvarado
- John Maro
- Jordan MacDonald
- Josh Heke
- Kahu Sutherland
- Kelly Rebate
- Matai Vila
- Phillip Cooper
- Soul Suliasi Toa
- William Wilson
-
Labour Hire
-
Other
-
Start Time
-
Finish Times
-
Did you have a 30 min break?
Add Truck
-
Driver
- Labour Hire
- Other
- Albert Heke
- Apa Vila
- Daniel Bishop
- David Bridgewater
- Eroni Baleilevuka
- Jasmin Alvarado
- John Maro
- Jordan MacDonald
- Josh Heke
- Kahu Sutherland
- Kelly Rebate
- Matai Vila
- Phillip Cooper
- Soul Suliasi Toa
- William Wilson
-
Labour Hire
-
Other
-
Job Comments
-
Additional Comments
-
Signed:
Daily Closure
-
Type of Closure:
- 24 Hours/Long Term
- Static Closure
- Semi Static Closure
- Mobile Closure
-
Shift Time
-
TSL Already Installed?
-
TSL Installed:
-
TSL Removed:
-
Weather Conditions:
- Fine
- Sun Strike
- Overcast
- Drizzly
- Rain
- Heavy Rain
- Wind
- Heavy Wind
- Snow
- Cold
- Hot
-
Work Operations:
Closure Equipment Checks (Check PPE, Safety Jackets, Cones, Signs...)
-
Check Number
-
Comments/Conditions: (Note any missing signs, signs or cones down, etc...)
-
Add media
-
Signed:
Accidents/Incidents:
-
Accidents/Incidents:
Accident/Incident
-
Date/Time of Incident
-
Accident/Incident Description:
-
Signed
-
Event Report Filed Out?
Job Start
-
1. LOOK - Do the Job START
-
2. TELL - My mate if he is being UNSAFE
-
3. TALK - About the Hazard Controls and Behaviours
-
Onsite Client Representative
Risk Rating Chart
-
1. What can harm me?
2. What can harm others?
3. What can harm the environment? -
Common Hazards
- Traffic/Vehicles
- Pedestrians (footpath closed)
- Pedestrians (footpath detour)
- Excess Speed
- Visibility
- Cyclists (cycle lane diversion/allowance)
- Cyclists (with live traffic)
- Large Vehicles
- Weather
- Mobility Scooters
- Poor Road Surface
- Lots of contractor movements
-
Good toolbox (site entry procedures), designated site access, other work vehicles well away.
-
Side friction, speed restriction, additional advanced warning (new seal?)
-
Good road surface, additional pedestrian lane width, use of driveways
-
Additional lane width, turning circles, tapers at good length
-
Additional signage, condition of signage, additional cones, extra sandbags, cable tie signage to poles, additional safety zones
-
Additional lane width, visibility,shoulders available
-
Narrow lanes, speed restriction, side friction kerb line of cones, additional safety zones
-
Placed where good visibility is achievable, out of worksite, TC on site, inside speed restriction
-
1.2m wide, cone barrier arms/safety fencing to contain, no trip hazards on route
-
Positive Traffic Management, good delineation, side friction, RGs
-
Good signage visibility, centreline of cones, side friction, extra safety zone area
-
Mitigation:
Site Specific Hazard
-
Hazard Description
-
Likelihood of Harm
-
Potential Consequences
-
Risk Rating Before Controls
Hazard Controls (How can we reduce personal and environmental harm here?)
-
Behaviour/Action to eliminate, isolate or minimise:
-
Person or Team Responsible
- Labour Hire
- Other
- Albert Heke
- Apa Vila
- Daniel Bishop
- David Bridgewater
- Eroni Baleilevuka
- Jasmin Alvarado
- John Maro
- Jordan MacDonald
- Josh Heke
- Kahu Sutherland
- Kelly Rebate
- Matai Vila
- Phillip Cooper
- Soul Suliasi Toa
- William Wilson
-
Labour Hire
-
Other
-
Completed By: (initials)
-
Date
-
Emergency Evacuation Point
-
Nearest emergency medical facilities
Signed by All Workers or Visitors to site:
-
Signed
TMP Modifications
- TMP Modifications
-
TMP Modifications
-
Comment
TTM Count
-
Cones
-
Cone Bars
-
L2 Stand and Base
-
L2 Sign
-
L2 Supplementary Sign
-
L1 Stand and Base
-
L1 Sign
-
L1 Supplementary Sign
-
Water filled barrier