Information

  • Audit Title

  • College

  • Conducted on

  • Prepared by

  • Location
  • Site Contact

Electrical

PORTABLE APPLIANCE TESTING (PAT)

  • Do you have a verified asset list of all portable appliances for your department?<br>

  • Are the PAT records in date?

  • Do you have a formal procedure for managing items that are deemed unsafe for use?

DISTRIBUTION BOARDS & PERIODIC FIXED WIRE TESTING

  • Do you have a verified asset list of all Distribution Boards within your buildings?<br>

  • Do all your buildings hold a current NIC EIC Periodic Testing Certificate?<br>

  • Have all remedial actions from the most recent periodic test been completed, verified and signed off?<br>

Electrical Thermal Imaging and Visual Surveys

  • Have Electrical Thermal Imaging and Visual Surveys been undertaken for your buildings within the past 12 months?<br>

  • Have all remedial actions from the Thermal Imaging, Visual Surveys or supplementary surveys been completed, verified and signed off?<br>

LIGHTNING PROTECTION

  • Do you have a verified asset list of all lightning protection systems for your buildings?<br>

  • Do all buildings with Lightning Protection Systems have an up-to-date testing certificate?<br>

Gas Safety

GAS SAFETY ( GENERAL )

  • Do you have a verified asset list of all Gas Plant?<br>

  • Have all items of gas plant been issued with a satisfactory CP4, 12 or 15 test certificate within the past 12 months?

LOLER

PASSENGER/GOODS LIFTS

  • Do you have a verified asset list of all lifts within your buildings?<br>

  • Have all the lifts currently in operation undergone a Statutory Inspection within the past 6 months?<br>

  • Are service records for all lifts in date?<br>

  • Are all recorded immediate defects (statutory inspections) being reviewed and actioned in accordance to the KCL LOLER Procedures?<br><br>

PLATFORM LIFTS (INC. STAIRS, BED etc.)

  • Do you have a verified asset list of all platform lifts within your buildings?<br>

  • Have all platform lifts currently in operation undergone Statutory Inspections in accordance with legislative requirement?<br>

  • Are all recorded immediate defects (statutory inspections) being reviewed and actioned in accordance to the KCL LOLER Procedures?<br><br>

  • Are all the service records in date?

MOBILE ELEVATED WORK PLATFORMS (MEWPS)

  • Do you have a verified asset list of all MEWPS?<br>

  • Is the equipment labelled with test/inspection date?

  • Have all MEWPS currently in operation undergone Statutory Inspections in accordance with legislative requirement (6-monthly thorough examination)?<br>

  • Are all recorded immediate defects (statutory inspections) being reviewed and actioned in accordance to the KCL LOLER Procedures?<br>

RUNWAY TRACKS

  • Do you have a verified asset list of all runway tracks under LOLER ?<br>

  • Is the equipment labelled with safe working load?

  • Have all Runway tracks currently in operation undergone a Statutory Inspections in accordance with legislative requirement?<br>

  • Are all recorded immediate defects (statutory inspections) being reviewed and actioned in accordance to the KCL LOLER Procedures?<br>

FORK LIFTS/HYDRAULIC TROLLEYS

  • Do you have a verified asset list of all fork lifts and/or hydraulic trolleys within your buildings?<br>

  • Is the equipment labelled with safe working load?

  • Are all recorded immediate defects (statutory inspections) being reviewed and actioned in accordance to the KCL LOLER Procedures?<br>

  • Have all items of fork lifts/hydraulic trolleys undergone statutory inspections within the past 12 months?

EYE BOLTS

  • Do you have an asset list of all eyebolts by building?<br>

  • Are all eyebolts labelled with a unique identifier and their status e.g. date of last test or do not use?<br>

Pressure Safety Systems (PSSR)

PRESSURE SAFETY SYSTEMS ( GENERAL )

  • Do you have a verified asset list of all plant under PSSR?<br>

WRITTEN SCHEMES OF EXAMINATION (WSE)

  • Do all pressure systems have an up-to-date written scheme of examination?<br>

STATUTORY INSPECTIONS

  • Have all pressure systems been subject to a statutory inspection within the past 12 months or as identified with the written scheme?<br>

  • Are all recorded immediate defects (statutory inspections) being reviewed and actioned in accordance with KCL Procedures?

PUWER

PUWER (GENERAL) ACCESS EQUIPMENT (NON-POWERED) - LADDERS, PODIUMS etc.

  • Do you have an asset list of all access equipment provided to your staff?<br>

  • Have all ladders, step ladders, podium steps, work platforms and mobile towers been subject to regular testing, inspections and tagging?<br>

ITEMS OF EQUIPMENT PROVIDED TO STAFF (EXCLUDING ACCESS EQUIPMENT) - INC TROLLEYS, POWER TOOLS ETC

  • Do you have a list of equipment provided to your staff?

  • Do the items listed above undergo a pre-use check by staff?

  • Have you carried out a workplace inspection including tools, plant and equipment since the last review?

  • Do you have a formal procedure for managing items of tools and equipment provided to staff which may be deemed unsafe for use?

General Fire Safety

FIRE RISK MANAGEMENT

  • Do all buildings under your responsibility hold a valid Fire Risk Assessment?

  • Have all the Fire Risk Assessments been reviewed within the past 12 months?

  • Are weekly Housekeeping Inspections being conducted for all buildings?

  • Have all remedial actions from the weekly inspection been completed and signed off within the last quarter?

  • Have all flammable liquids or materials used by your teams been provided with a suitable and sufficient storage facility?

FIRE FIGHTING/CONTROL

  • Do you have a list of all Fire Extinguishers and Fire Hoses within your buildings?

  • Have all your Fire Extinguishers and Fire Hoses been subject to maintenance within the past 12 months?

  • Do you have a list of all Fire Suppression Systems within your buildings?

  • Have all your Fire Suppression Systems been subject to maintenance and testing within the past 12 months?

  • Do you have a verified list of all fire doors within your buildings?

  • Have all your fire doors undergone a maintenance/visual inspection within the past 12 months?

  • Do you have a verified list of all Fire Compartment Shutter/Roller Shutters within your buildings?

  • Have all fire compartment shutters/roller shutters been subject to maintenance inspections within the past 12 months?

FIRE DAMPERS & VENTILATION

  • Do you have verified Schematics identifying all fire dampers within your buildings?

  • Have all the fire dampers undergone testing within the past 2 years?

  • Do you have verified schematics of kitchen extracts for all your buidings?

  • Have all your kitchen extracts been subject to inslection and cleaning within the past 14 months?

  • Do you have verified schematics for all general ventilation ducts within your buildings?

  • Have all your general ventilation ducts been subject to inspection within the past 5 years?

General Safety Management

GENERAL SAFETY MANAGEMENT

  • Have all members of your team been provided with access to the Directorate's Health & Safety Arrangements Document?

  • Have all members of your team been provided with access to the Directorate's Safe Systems of Work?

  • Have all members of your team been provided with access to the Directorate's Operational Procedures?

  • Are suitable Local Health & Safety Arrangements in place including Responsible Persons, First Aiders, Risk Assessors and Permit Issuers?

  • Have all the persons with safety responsibilities been suitably trained?

  • Do you have an up-to-date training matrix identifying all roles within your responsibility?

  • Have all planned maintenance activities been assessed with a suitable and sufficient risk assessment?

  • Have all relevant members been provided access to the planned maintenance risk assessments?

  • Have you carried out a workplace inspection within the past 6 months?

  • Have all the correct types of PPE been issued as identified within the risk assessments?

  • Do you have an asset list of all PPE provided to your team members?

  • Have members of your team attended a toolbox talk withing the last 2 months?

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

  • Have all staff members carrying out maintenance activities been provided with a means of accessing the asbestos register?

  • Do you have a list of all chemicals or hazardous substances used by your teams?

  • Have all chemicals or hazardous substances used or stored by your teams been subject to a suitable and sufficient COSHH Assessment?

  • Have all chemicals and hazardous materials been provide with suitable and sufficient storage facilities?

  • Is there a procedure in place for managing spilliages, accidents or incidents involving chemicals or hazardous substances used by your teams?

Further Information and Comments

Further information

  • Further Information

  • Photos

  • Sketches ( if necessary )

Conclusions and Recommendations

Conclusions

  • Tap to enter information

Recommendations

  • Tap to enter information

Reviewers Signatures

  • 1st Reviewer

  • 2nd Reviewer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.