Information

22773 EA - CULVERT INSPECTION & CLEANING CONTRACT

  • Conducted on

  • Project number

  • Prepared by

Works detail

  • Assessed priority

  • Site Address

  • Nature of Works

  • Approx length

  • Summary of findings

  • Silt sample required?

  • Number of men required for task

Inlet Structure

  • Photo of Inlet structure

  • Comments

  • Photo of Watercourse upstream from inlet

  • Comments

Culvert inlet

  • Height (mm)

  • Width (mm)

  • Water depth (mm)

  • Material

  • If other please detail

  • Approx silt depth at outlet (mm)

  • Additional notes

  • Overhead services

Access to Culvert

  • Type of land

  • If other please give details

  • Restrictions & contact numbers

Working area

  • Off road parking?

  • Restrictions / directions

  • Soft / uneven ground?

  • Restrictions / directions

  • Stock present?

  • Restrictions / directions

  • Traffic Management

  • Restrictions / directions

Bridges

  • Location

  • Weight restriction

  • Width restriction (mm)

  • Height restriction. (mm)

Outlet structure

  • Photo of outlet structure

  • Comments

  • Photo of watercourse downstream from outlet

  • Comments

Culvert outlet

  • Height (mm)

  • Width (mm)

  • Water depth (mm)

  • Material

  • If other please detail

  • Approx silt depth at outlet (mm)

  • Additional notes

  • Overhead services

Access to culvert

  • Type of land

  • If other please give details

  • Restrictions & contact numbers

Working area

  • Off road parking?

  • Restrictions / directions

  • Soft / uneven ground?

  • Restrictions / directions

  • Live stock present?

  • Restrictions / directions

  • Traffic management

  • Restrictions / directions

Bridges

  • Location

  • Weight restriction

  • Width restriction (mm)

  • Height restriction (mm)

Additional photographs

  • Additional photo 1

  • Note

  • Additional photo 2

  • Note

  • Additional photo 3

  • Note

  • Additional photo 4

  • Note

  • Additional photo 5

  • Note

  • Additional photo 6

  • Notes

Environmental & Pollution control

  • Environmental or pollution Control Matters which might effect the risk Assessment .

  • Any other matters relevant to the risk Assessment ?

Sign off

Report preparation

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.