Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
A - Workplace - Element, checks and records
-
Site access - suitable and safe, properly maintained
-
Site security - fencing to compound/site adequate and properly maintained
-
Traffic management - Suitable signage, fencing, traffic movement/parking plan
-
Pedestrian routes - Suitable for movement around site
-
Dust/mud suppression around site - adequately controlled
-
Lighting - suitable for operations in place (external & internal)
-
Housekeeping - Site tidy to an acceptable standard (slips/trips & falls)
-
Material storage areas - contained, tidy and safe
B - Welfare & storage
-
Welfare facilities - Clean and tidy, hot/cold water, soap, towel/driers etc
-
H&S area - All relevant information still visible, H&S file up to date, 1st Aid kit complete
-
Induction Form - Up to date with who is working on site
-
PPE - Sufficient spare ppe available (for employees and visitors)
-
Internal Storage areas - maintained, tidy and safe
C - Fire
-
Fire extinguishers on site in proper location and checklist form up to date
-
Fire assembly point and escape routes (where reqd) identified
-
Fire prevention - debris cleared, electric elements safe, smoking in designated areas only
-
Is means of raising alarm appropriate to the size and nature of the building or workplace?
D - Plant & Equipment
-
Tools/equipment suitable for use
-
Access scaffolding - Scaff tags/inspection reports up to date
-
Access Towers/ladders/hop ups - Maintained and safe to use
E - General
-
Current work activities - Work is being carried out in a safe manner
-
Method statements - Copies available for specific work being carried out
-
Risk assessments - Copy available on site and renewed/updated for specific activities
-
Working at height - Adequate systems in place to prevent falls from height or falling materials
-
Lifting - Suitable procedures in place if work being carried out
-
Noise - Hearing protection being worn where necessary, measures in place to prevent activities creating a statutory nuisance in terms of noise
-
Vibration - Suitable tools and ppe being used to reduce hand-arm vibration , measures in place to prevent activities creating a statutory nuisance in terms of vibration
-
Manual handling - Materials etc being moved around site in a suitable manner
APPENDIX 1 - PROJECT RISK ASSESSMENTS
-
What risk assessment do you require?
- Manual Handling Risk Assessment
- PPE Risk Assessment
- Work Equipment Risk Assessment
-
Insert Link
-
Insert Link
-
Insert Link
APPENDIX 2 - TOOLBOX TALKS
-
Please select the toolbox talk you wish to access.
- Manual Handling
- PPE, Use and storage
- Workplace Equipment
-
Insert Link
-
Insert Link
-
Insert Link