Title Page

  • 26 North Street, Palmerston North (Building 1-8) - Defect Inspection

  • Conducted on

  • Prepared by

  • Location

Overall Site

  • Letterbox Installed

  • letterbox Numbers installed (as per plan & council issued)

  • Development Name / Signage Installed

  • Way Finding Signage Installed

  • Carpark Completed

  • Carpark line marking completed (including numbering)

  • Paths and ramps installed

  • Handrails installed

  • Rubbish / Bin Stores completed

  • Bike Parking completed

  • Landscaping completed (including plants & lawn)

Building 1

Building 1 - Unit 1

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 2

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 3

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 4

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 5

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 6

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 2

Building 2 - Unit 7

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 8

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 2 - Unit 9

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 10

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 2 - Unit 11

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 1 - Unit 12

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 3

Building 3 - Unit 13

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 4

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 3 - Unit 14

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 4

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 3 - Unit 15

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 4

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 4

Building 4 - Unit 16

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 4 - Unit 17

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 4 - Unit 18

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 4 - Unit 19

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 4 - Unit 20

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 4 - Unit 21

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5

Building 5 - Unit 22

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 23

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 24

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 25

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 26

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 27

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 28

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 29

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 30

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 31

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 32

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 5 - Unit 33

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 6

Building 6 - Unit 34

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 6 - Unit 35

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 6 - Unit 36

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 6 - Unit 37

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 6 - Unit 38

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 6 - Unit 39

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 7

Building 7 - Unit 40

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 7 - Unit 41

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 7 - Unit 42

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 7 - Unit 43

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 7 - Unit 44

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 1

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom 2

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 3

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Community Space - Unit 50

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Meeting Room

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 8

Building 8 - Unit 45

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 8 - Unit 46

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 8 - Unit 47

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 8 - Unit 48

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 8 - Unit 49

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

Building 8 - Unit 50

  • Door Numbering

Power

  • Lighting

  • Individual Power Points

  • Fans / Extraction

Water

  • Water is on

  • Shut off valve / tap located

  • Hot water is on and at correct temparature

  • Water pressure is acceptable

Kitchen

  • Appliances installed & operational

  • Benchtop okay

  • All cupboards operational

  • Sink plug is supplied

  • Rangehood operational

  • Paint completed (note defects)

  • Floor coverings completed

Bathroom

  • Vanity installed & no damage

  • Medicine cabinet installed

  • Shower door / curtain in place and not leaking

  • Fan operational

  • Falls on floors correct (if applicable)

  • Toilet roll holder installed

  • Towel holder installed

  • Door hardware (incl lock) works

  • Toilet operational

  • Paint completed (note defects)

  • Floor coverings completed

Lounge / Living Area

  • Heatpump / Heater in place & operational

  • Doors / Ranchslider operational

  • Paint completed (note defects)

  • Floor coverings completed

Laundry

  • Sink / basin operational

  • Hand towel holder installed

  • Hot Water Cylinder installed & operational

  • Doors operational

  • Fan operational

  • Paint completed (note defects)

  • Floor coverings completed

Bedroom 1

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Bedroom 2

  • Lights operational

  • Heating operational (if applicable)

  • Windows operational

  • Wardrobe doors operational

  • Wardrobe shelving in place

  • Door functional & lock / handle working

  • Floor coverings completed

Exterior

  • Decking in place

  • Handrails completed

  • Clothesline installed

  • Lighting operational

  • Paint completed (note defects)

General

  • CCTV in place

  • Power meter in place (incl ICP No)

  • Water meter in place

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.