Title Page
-
Flat no:
-
Block Name:
-
Appointment Number:
-
Conducted on
-
Prepared by
-
Installation of CPE
-
Is there light at the POE?
-
Have you managed to locate the DP and check the levels?
-
Light levels at POE (outside the property).
-
Photo of light level at POE
-
Evidence of fire stopping & Internal cable route.
-
Light levels in the property
-
Photo of light levels in property
-
Please provide CPE serial number.
-
Photo of CPE serial number.
-
Please provide photo of installed router (evidence of as it was left)
-
Please provide photo of WIFI speed test results.
-
Extra useful notes (If required)
-
Upon arrival located POE and checked light reading, fine. Discussed drilling, cable route and equipment location. Drilled and added router to wall and customer connected.
Sign Off
-
I confirm that I am happy with the standard of work carried out by the Engineer today, I understand that charges may be applicable in accordance with the terms and conditions of the contract with the service provider.
-
Customer Signature
-
I confirm that I have completed this work to the best of my ability.
-
Engineer Signature