Title Page
-
Site conducted
-
Conducted on
-
Prepared by/ site name
-
Location
Access Information (Door Codes/Lockbox)
-
Please provide information
Headend Cabinet
-
Location of Headend Cabinet
-
Is the cabinet installed using the correct fixings?
-
Is the cabinet racked and stacked correctly?
-
Is Splitter panel installed?
-
Is the fibre tray installed and labelled?
-
Has the cabinet been patched?
-
Have cable management bars been installed?
-
Has the power been completed to the Cabinet?
-
Has the EAD been installed?
-
Is the EAD live? ( powered and green light showing)
-
Additional Information
FDP 1
- FDP
-
FDP Location
-
Access Details for FDP
-
Is the FDP Installed in the correct location?
-
Is the FDP labelled correctly with label tape? Add media
-
Have the correct fixings been used to secure the FDP?
-
Has the FDP been spliced correctly? please add media
-
How many splitters have been installed within the FDP?
-
Have the splitters been installed correctly? Please add media
General Housekeeping
-
Has the correct method of firestopping been used within this building/block? Please add media
-
Have the correct cable routes been followed as per the planning pack?
-
Has containment been installed within this building/block?
-
Have non combustible fixings been used within this building/block? Please add media.
-
Have hallway clips been installed correctly with the correct spacing between them?
-
Has white mastic been put over the hallway clips in all areas? Please add media
-
Are all POEs installed central, level and in the correct locations? Please add media.
-
Are all POEs spliced and wrapped in to standard? Please add media.
-
Have all Splitter legs been tested from FDP to POE at 1490nm with a result below 13db?
-
Is this block/building cleared of all rubbish and surplus materials? ie fibre cut offs ect
Sign off
-
Comments?
-
Engineer sign off.