Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add signature
1.0 Sort - No unnecessary items in the area
-
1.1 No obsolete parts, equipment, pipes etc. in the area.
-
1.2 All storage areas are tidy.
2.0 Set - A place for everything
-
2.1 All chemicals are stored and labelled correctly.
-
2.2 All fixed pipe work, tanks, conduit etc. are labelled to indicate contents. All equipment gauges, dials, buttons, lubrication points etc. are labelled and indicate desired operating range if applicable.
-
2.3 All equipment, tools, parts, work in progress and other items are in designated and labelled locations.
-
2.4 All walkways, safety zones (emergency showers, exits, fire equipment etc.) are clearly signed and are not obstructed.
3.0 Shine - clean workplace and equipment
-
3.1 Area is clean and free from rubbish. Cupboards, shelves and work benches are clean and tidy. All bins are labelled and colour coded
-
3.2 All equipment is free from rust and temporary repairs, excess lubricant, chemical, water and product leakage and residue. All macinbe tools are free from swarf and offcuts.
-
3.3 All floors are free from swarf, filings and off cuts.
-
3.4 All hand wash & paper towel dispensers stocked and being used and a bin is available.
4.0 Standardise - compliance to standards
-
4.1 All staff are using relevant PPE and have clean uniforms.
-
4.2 All lights are covered and operational
-
4.3 No crates or product containers are being used for any purpose other than designated.
-
4.4 No obsolete or uncontrolled documents (process documents, notices etc.) in the area
5.0 Sustain - Maintain standards (only answer the following questions if an area has been 5Sd, otherwise mark N/A)
-
5.1 The audit roster is posted, current, assigned to individual team members, and signed off.
-
5.2 The audit result is posted and current.
-
5.3 The area map is posted and current.
-
5.4 All 5S Area Standard/s are posted and current.
Waste Observation
-
Are any wastes observed? Please specify location and describe the waste.<br>Example: overstock of maintenance spares, air leaks.....etc
-
Describe the corrective actions required.