Title Page
-
Site Name
-
Site Number
-
Conducted on
-
Prepared by
-
Location
-
Have you signed into the Coles Guestbook?
General - Team Lead Questions
-
Has all equipment delivered to site been cross-checked against pick-slips?
-
What is missing?
-
Is there any equipment being returned to Matraville?
-
What is being returned? Have you labelled the items as "Returns"?
-
Image of equipment being returned
-
Is any faulty equipment being returned?
-
What was faulty? Please ensure these are labelled
-
Image of equipment being returned
-
Are all technicians onsite?
-
Who is missing and has the PM been notified?
-
Please provide Assist Names
ACO Details
-
Total Number of ACOs Installed tonight
Individual ACO Details
-
ACO Lane Number
-
ACO Serial Number
-
Pin Pad Serial Number
-
Pin Pad Type
-
Pin Pad Asset Number
-
Scanner Scale Serial Number
-
Are there any existing issues with this ACO? (upload photo of issue)
-
What is the issue?
-
Photo of Issue
-
Type of Activity
- New Installation - Final Position
- New Installation - Temp Position
- Rebuild / XR7 Swap Only
- Existing Unit Modification
- Relocation Only
- No change
- Decommission / Removal
-
What type of unit is this? (TACO / CACO / ECO / ACO)
-
Has Hand Scanner been installed, cable routed correctly, programmed, and tested?
-
Has bag shelf been lowered and trolley confirmed able to fit over shelf?
-
Has park your trolley here sticker been fitted?
-
Is correct bag rack fitted?
-
Are Cashbox/Recycler (GSR50) Locks Installed?
-
Assa-Abloy Lock Number
-
Has ACO been bolted down?
-
Provide Reason
-
Is ACO in correct position. Legs down, skirts fitted, stable and levelled?
-
Provide Reason
-
Does DMI match workpackage?
-
Provide Reason
-
Is Customer Facing Scanner and bracket (CFS) installed on correct side, programmed, and tested?
-
Has a Weighted Item been tested on the scanner scale?
-
Have BNR components been tested with $5 / $10 / $20 notes
-
Has Receipt Printer been tested / has paper?
-
78xx Scanner & Scale installed and working?
-
Has scanner scale display been mounted to unit correctly?
-
Has Tri-Light been tested and lights confirmed working?
-
Has Pinpad been tested and secured on mount?
-
Has the ACO Wrapping been completed?
-
Have the Trilight decals been applied?
-
Has a security kit been fitted?
-
Have the correct outer cable management standards been applied?
-
Are there visible screw holes on ACO Chassis?
-
Can the ACO door be opened unimpeded?
-
Provide Reason
-
Can the XR7 Head be tilted back to allow full access to cables below?
-
Provide Reason
-
Any other comments?
-
Photo #1 of ACO - Front of Unit showing lane number and Green-Trilight
-
Photo #2 of ACO - Side of ACO showing lane number and Red-Trilight
-
Photo #3 of ACO - Label showing lane number on side of ACO
-
Photo #4 of ACO - Scale Display showing correct mounting and value on display with lane number
-
Photo #5 of ACO - XR7 Head tilted back to show cables
-
Photo #6 of ACO - Outer Cable Management (behind ACO)
-
ACO Operational for trade
-
Provide reason
-
What type of unit is this? (TACO / CACO / ECO / ACO)
-
Has Hand Scanner been installed, cable routed correctly, programmed, and tested?
-
Provide reason
-
Has bag shelf been lowered and trolley confirmed able to fit over shelf?
-
Has park your trolley here sticker been fitted?
-
Is correct bag rack fitted?
-
Has ACO had a bagwell change
-
Changed to
- Left Hand
- Right Hand
- Removed Bagwell (TACO/CACO/ECO)
-
Has the side of Chassis been cleaned?
-
Provide Response
-
Are there visible screw holes on ACO Chassis?
-
Are Cashbox/Recycler (GSR50) Locks Installed?
-
Assa-Abloy Lock Number
-
Is ACO in correct position. Legs down, skirts fitted, stable and levelled?
-
Provide reason
-
Has ACO been bolted down?
-
Provide Reason
-
Does DMI match workpackage?
-
Provide reason
-
Is Customer Facing Scanner and bracket (CFS) installed on correct side, programmed, and tested?
-
Has Receipt Printer been tested / has paper?
-
78xx Scanner & Scale working?
-
Has scanner scale display been mounted to unit correctly?
-
Has Tri-Light been tested and lights confirmed working?
-
Has Pinpad been tested and secured on mount?
-
Has ACO Wrapping been completed?
-
Have the Trilight decals been applied?
-
Can the ACO door be opened unimpeded?
-
Provide Reason
-
Can the XR7 Head be tilted back to allow full access to cables below?
-
Provide Reason
-
Any other comments?
-
Photo #1 of ACO - Front of Unit showing lane number and Green-Trilight
-
Photo #2 of ACO - Label showing lane number on side of ACO
-
Photo #3 of ACO - XR7 Head tilted back to show access to cables
-
Photo #4 of ACO - Outer Cable Management (behind ACO)
-
What type of unit is this? (TACO / CACO / ECO / ACO)
-
Previous ACO #
-
Build Successful
-
Provide reason
-
ACO Asset & NMI label updated
-
Provide reason
-
Does DMI match workpackage?
-
Provide Reason
-
Have the Trilight decals been applied?
-
ACO Operational for trade
-
Provide reason
-
Photo #1 of ACO - Front of Unit showing lane number and Trilight
-
Photo #2 of ACO - Label showing lane number on side of ACO
-
What type of unit is this? (TACO / CACO / ECO / ACO)
-
Has ACO been placed into Hoarding area / temp position?
-
Provide reason
-
Has a software build been completed?
-
What type of unit is this? (TACO / CACO / ECO / ACO)
-
Are there visible screw holes on ACO Chassis?
-
Is ACO in correct position. Legs down, skirts fitted, stable and levelled?
-
Provide reason
-
Has ACO been bolted down?
-
Provide Reason
-
Has ACO Wrapping been completed?
-
Have the Trilight decals been applied?
-
Can the ACO door be opened unimpeded?
-
Provide Reason
-
Can the XR7 Head be tilted back to allow full access to cables below?
-
Provide Reason
-
Any other comments?
-
Photo #1 of ACO - Front of Unit showing lane number and Green-Trilight
-
Photo #2 of ACO - Label showing lane number on side of ACO
-
Photo #3 of ACO - XR7 Head tilted back to show access to cables
-
Photo #4 of ACO - Outer Cable Management (behind ACO)
-
Tri-light removed and placed on bagwell
-
Collection consignment label placed on decommissioned ACO
-
ACO palletized ready for collection
-
Photo of decommissioned ACO taken
Completion & Sign-Off Details
-
Was a mini-hub provided to NCR for ACO build purposes?
-
Was it returned to Coles/shopfitter?
-
Name of person
-
Have keys been handed to the store?
-
Have spare cash box handed to store staff for each new BNR ACO
- Yes
- No
- Future Night
- Not applicable (No new Cash ACOs)
-
Provide reason
-
Is there minimum 700mm spacing between ACOs in the pen?
-
Provide Reason
-
Photo of ACO Area - Photo of Bank #1
-
Photo of ACO Area - Photo of Bank #2
-
Photo of ACO Area - Photo of Bank #3 (if applicable)
-
Photo of ACO Area - Photo of Bank #4 (if applicable)
-
Photo of ACO Area - Photo of Bank #5 (if applicable)
-
Photo of ACO Area - Photo of Bank #6 (if applicable)
-
Photo of ACO Area - Photo of entire ACO area
-
Is the Go-Live Technician Onsite?
-
Is Scale Certification Complete?
-
Provide reason
-
Completion Time
-
Has permission been granted by NCR overnight support to leave site?
-
Has a Coles Team Member performed operational signoff on new installed ACO lanes?
-
Name of Team Member who performed operational signoff
-
Reason for not performing operational signoff
-
Coles Team Member Name (Manager in Charge)
-
Coles Team Member Signature