Information
Demolition Check Sheet
-
License Name:
-
PCBU Name:
-
ABN:
-
PCBU Phone:
-
PCBU Supervisor:
-
Location
-
Conducted on
-
Inspection Conducted by:
Demolition Check Sheet
-
Is the workplace secured from unauthorised access? <br>WHS Regulation 2011, Clause 298.
-
Action Taken / Notice Issued / Comments
-
Is there a demolition plan? COP Demolition Work, states that a demolition plan should be prepared where multiple PCBU’s are involved? WHS Act 2011, Clauses 34-38
-
Action Taken / Notice Issued / Comments
-
SWMS prepared and readily accessible? WSM Regulation 2011, Clause 299.
-
Action Taken / Notice Issued / Comments
-
Has an asbestos clearance certificate been issued before the work area is re-occupied for demolition work? WHS Regulation 2011, Clause 474.
-
Action Taken / Notice Issued / Comments
-
Have hazardous chemicals and materials been identified by a competent person i.e. Asbestos, Lead, PCBs, SMF’s? WHS Regulation 2011, Clause 49.
-
Action Taken / Notice Issued / Comments
-
Are falling objects controlled i.e. chutes, debris drop area, exclusion zones? WHS Regulation 2011, Clause 54 & 55.
-
Action Taken / Notice Issued / Comments
-
Are control measures in place to isolate the work from the public such as security fencing, OHP structure, & exclusion zones? WHS Regulation 2011, Clause 34-38.
-
Action Taken / Notice Issued / Comments
-
Are fall risks managed? WHS Regulation 2011, Clause 78.
-
Action Taken / Notice Issued / Comments
-
Have all essential services been located and/or disconnected i.e. electricity, gas, water, sewer, telecoms, gaseous fire suppression systems, fuel, refrigerants? WHS Regulation 2011, Clauses 34-38 & 304.
-
Action Taken / Notice Issued / Comments
-
Is the supervisor onsite and named to SafeWork NSW (check GLS database)? WHS Regulation 2011, Clause 325.
-
Action Taken / Notice Issued / Comments
-
Is dust from demolition activity being controlled I.e. vehicles, plant etc.? WHS Regulation 2011, Clause 35.<br>
-
Action Taken / Notice Issued / Comments
-
Signage identifying PCBU (if deemed a construction project)? WHS Regulation 2011, Clauses 292,293 & 308.
-
Action Taken / Notice Issued / Comments
-
Does the PCBU have the correct licence type i.e. DE1 or DE2? WHS Regulation 2011, Clause 143.
-
Action Taken / Notice Issued / Comments
-
Is plant inspected on a regular basis? WHS Regulation 2011, Clause 213.
-
Action Taken / Notice Issued / Comments
-
Is an adequate first aid kit available? WHS Regulation 2011, Clause 42(1)<br>
-
Action Taken / Notice Issued / Comments
-
Is a worker onsite trained in first aid (Basic first aid as a minimum)? WHS Regulation 2011, Clause 42(2)<br>
-
Action Taken / Notice Issued / Comments
-
Are adequate facilities available for workers i.e. toilets, drinking water? WHS Regulation 2011, Clause 41.
-
Action Taken / Notice Issued / Comments
-
Is the work required to be notified to SafeWork NSW i.e. structure >6m in height? HWS Regulation 2011, Clause 142.<br>
-
Action Taken / Notice Issued / Comments
-
Have workers been trained i.e. GIT, site specific, high risk work licence? WHS Regulation 2011, Clause 39 & 316.
-
Action Taken / Notice Issued / Comments