Information
-
Conducted on
-
Prepared by
-
Date
-
Standard/Arranged
-
Cold call
Referral Source
-
Source
- Phone Call
- Letter
- Other
Tenant/Homeowner Details
-
Name
-
Address
-
Phone Number
-
Mobile Number
-
Email Address
-
Preferred Time of Contact
- Morning
- Afternoon
- Evening
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
Preferred Contact Method
- Landline
- Mobile
- Letter
Client/Landlord Details
-
Name
-
Address
-
Phone Number
-
Mobile Number
-
Email Address
-
Preferred Method of Contact
- Phone Call
- Letter
- Other
-
Preferred Time of Contact
- Morning
- Afternoon
- Evening
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
Property details
Property Details
-
Property Type
- Mid-Terrace
- End terrace
- Semi-detached
- Detached
- Lower Flat
- Middle Flat
- Top Flat
- Masonette
- Other
-
Building finish
-
Number of Bedrooms
-
Type of Heating
- Gas
- Oil
- Solid Fuel
- Electric
- Other
-
Insulation Works Required
- Loft Insulation
- Cavity Wall Insulation
- Draught Proofing
- Extraction
- Underfloor Insulation
- Internal Wall Insulation
- Spray Foam Insulation
-
Structural condition
-
External Wall Condition
-
Remedial works required
-
Adequate ventilation to work area
-
Dampness or water damage
-
Photo of each elevation
-
Building defects
-
Protected species or rodents
-
Safety monitors present
- Smoke Alarm
- Fire Alarm
- CO2 Alarm
- Cold Alarm
-
Have the alarms all been tested by surveyor
-
Special Instructions
Access
-
On site parking
-
Client Instructions
-
Access Issues
-
Access Equipment Required
- None
- Ladders
- Tower
- Scaffolding
- Cherry Picker
- Scissor lift
- Spider
- Conservatory Ladder
Loft Insulation
-
Photo of loft
-
Area to be insulated
-
Existing Depth
- 0mm
- 50mm
- 70mm
- 100mm
- 150mm
- 200mm
- 250mm
- 270mm
- 300mm
-
Photo of existing depth
-
Depth to be added
-
Loft drawing
-
Relay Required
-
Please note any pipe work that required lagging
-
Loft hatch needing D/P
-
Loft vents required
-
Areas to be omitted
-
Walkway required
-
Loft clearance
-
Additional notes
Cavity Wall Insulation
Details
-
Total area to be insulated
-
Required material
-
Average Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Total area to be omitted
-
Photos of omitted areas
-
Number of air bricks
-
HTT reason
-
Number of Cavity brushes required
-
Core vent required
-
Photo of any defects
-
List any defects
-
List all access issues
-
Photo of access issues
-
Location of chimneys
- Internal
- External
- Front Elevation
- Rear Elevation
- Left Hand Elevation
- Right Hand Elevation
- None
-
Location of flue
- Internal
- External
- Front Elevation
- Rear Elevation
- Left Hand Elevation
- Right Hand Elevation
- None
Front Elevation
-
Boroscope photo
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Elevation Drawing
Rear Elevation
-
Boroscope photo
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Elevation Drawing
Right hand elevation
-
Boroscope photo
-
Cavity Depth
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Elevation Drawing
Left hand elevation
-
Boroscope photo
-
Cavity Depth
-
Elevation Drawing
Extraction
-
Total area to be extracted
-
Reason for extraction
-
Material being extracted
-
Recommended cavity drying time
-
Are all apertures sealed internally
-
Moisture reading results
-
Has client been advised on extent on drilling and core holes
Spray Insulation
-
Area to be sprayed
-
Product to be sprayed
-
Photo of area to be sprayed
-
Depth of joists
-
Depth to be sprayed
- 40mm
- 45mm
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
- 75mm
- 80mm
- 85mm
- 90mm
- 95mm
- 100mm
- 105mm
- 110mm
- 115mm
- 120mm
- 125mm
- 130mm
- 135mm
- 140mm
- 145mm
- 150mm
- 155mm
- 160mm
- 165mm
- 170mm
- 175mm
- 180mm
- 185mm
- 190mm
- 195mm
- 200mm
-
Finish to be applied
- None
- FPC
- EMA
- Plained
-
Adequate ventilation
-
Special instructions
Draught Proofing
-
Loft hatch
- Brown
- White
- Bottom Brush
- O Tube
- Letterbox Cover
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Internal Door
- Brown
- White
- Bottom Brush
- O Tube
- Letterbox Cover
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
External Door
- Brown
- White
- Bottom Brush
- O Tube
- Letterbox Cover
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Standard window
- Brown
- White
- Bottom Brush
- O Tube
- Letterbox Cover
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Sash windows
- Brown
- White
- Bottom Brush
- O Tube
- Letterbox Cover
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
Generic Risk Assessment
-
HAZARD
Injury to employees and public
POTENTIAL
Slips, Trips, Falls
EXISTING RISKS
Medium
CONTROL MEASURE
H&S checklist, Good Housekeeping, Safety Signage
REVISED RISK
Low -
HAZARD
Working at height
POTENTIAL
Falls, Material falls
EXISTING RISK
Medium/long ladder, Free standing
CONTROL MEASURE
Complete daily checklist, Correct use of ladder, Safety signage
REVISED RISK
Low -
HAZARD
Signage control
POTENTIAL
Public intrusion into work area
EXISTING RISK
High
CONTROL MEASURE
Signage, Barrier use
REVISED RISK
Medium -
HAZARD
Access arrangements
POTENTIAL
Falls, Cuts, Damage
EXISTING RISK
Medium
CONTROL MEASURE
Survey inspection
REVISED RISK
Medium -
HAZARD
Non-floored loft
POTENTIAL
Trips, Property damage, Knee injury
EXISTING RISK
High
CONTROL MEASURE
Crawl boards, Knee pads, Ceiling weight checked at survey
REVISED RISK
Medium -
HAZARD
Substance hazard
POTENTIAL
Vapour, Dust, Inhilation, Skin contamination
EXISTING RISK
High
CONTROL MEASURE
PPE use, Face masks
REVISED RISK
Low -
HAZARD
Manual handling
POTENTIAL
Personal injury
EXISTING RISK
Medium
CONTROL MEASURE
PPE, Correct manual handling technique
REVISED RISK
Low -
HAZARD
Lone working
POTENTIAL
Illness, Injury
EXISTING RISK
High
CONTROL MEASURE
Phone use, Local emergency contacts, First aid kit
REVISED RISK
Medium -
HAZARD
Drilling
POTENTIAL
Debris injury
EXISTING RISKS
High
CONTROL MEASURE
Eye protection, Correct PPE
REVISED RISK
Medium -
HAZARD
Visibility
POTENTIAL
Falls, Trips, Errors
EXISTING RISK
High
CONTROL MEASURE
Use correct lights, Daily checklist
REVISED RISK
Low -
HAZARD
Loose electric cables, pipe work
POTENTIAL
Shocks, Trips, Falls, Snags
EXISTING RISKS
High (where present)
CONTROL MEASURE
Inform client, Ensure power off, Make secure
REVISED RISK
Low -
HAZARD
Material injection
Sand/cement use
POTENTIAL
Harmful if ingested, Mess, Foot injury (Weight)
EXISTING RISKS
Medium
CONTROL MEASURE
Safety boots, Gloves
REVISED RISK
Low -
HAZARD
Vibration
POTENTIAL
VWF, Personal injury
EXISTING RISKS
High
CONTROL MEASURE
Correct grip, PPE use
REVISED RISK
Medium -
HAZARD
Birds/bees/wasps nests
POTENTIAL
Personal injury
EXISTING RISKS
High
CONTROL MEASURE
Inform client, Arrange removal
REVISED RISK
Low -
HAZARD
Asbestos
POTENTIAL
Exposure, Illness
EXISTING RISK
High
CONTROL MEASURE
Asbestos survey
REVISED RISK
Low -
HAZARD
Hand tools
POTENTIAL
Cuts, Bruises, damage to clothing
EXISTING RISKS
Medium
CONTROL MEASURE
Knife sheath, Daily checks
REVISED RISK
Low -
HAZARD
Confined spaces
POTENTIAL
Back injury, breathing
EXISTING RISKS
Medium
CONTROL MEASURE
Regular breaks, Correct PPE
REVISED RISK
Low -
HAZARD
Machinery
POTENTIAL
Electrocution, Limb injury
EXISTING RISKS
High
CONTROL MEASURE
Due servicing, Daily checks
REVISED RISK
Medium -
HAZARD
Noise
POTENTIAL
Hearing damage, Disturbance
EXISTING RISKS
High
CONTROL MEASURE
Ear defenders, Notification
REVISED RISK
Low/Medium -
HAZARD
Parking
POTENTIAL
Public injury, Vehicle damage
EXISTING RISKS
Medium
CONTROL MEASURE
Due care, Use banksman
REVISED RISK
Low -
HAZARD
Dust (drilling)
POTENTIAL
Breathing problems, Mess
EXISTING RISKS
Medium
CONTROL MEASURE
Mask use, Proper cleaning
REVISED RISK
Low/Medium
Dynamic Risk Assessment & Client Declaration
Dynamic Risk Assessment
-
I have assessed the conditions on site ensuring there is adequate ventilation and no evidence of damp and no remedial works required. Unless listed below, there are no additional significant hazards observed that are not addressed in the generic risk assessment for the work to be undertaken.
-
Surveyor signature
Tenant/Homeowner health & safety pre-start checks and information
-
Is there a tenant/homeowner present
-
If yes ensure that the full scope of work that is due to be carried out is fully explained
-
Ensure that the tenant/homeowner is fully aware of all the work activities (including areas to be omitted) and safety issues relating to parking, the working are, hazards, equipment being used, noise and waste
-
I have been made fully aware of all the work activities (including the ares to be omitted) due to take place at my property
-
I have been made fully aware of the hazards associated with the work and where applicable, all the additional safety measures that will have to be taken
-
I agree to the works being carried out
-
Client signature