Information
-
Job Number
-
Job Name
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 Administration
-
1.1 Documented Pre-Construction Meetings?
-
1.2 Frequent safety Inspections completed?
-
1.21 Date of last inspection
-
1.3 SDS available or accessible?
-
1.4 Job site postings state and federal current? <br>
-
1.5 Jobsite Crisis Management Plan? Phone Tree?
-
1.6 Safety meetings completed?
2.0 Safety Plans
-
2.1 Site Specific Safety Plan
-
2.2 Site Specific Safety Plan for Subcontractors?
-
3.3 Other?
3.0 JHA/JSA/PTP/Work Permits
-
3.1 Job description adequate?
-
3.2 JHA completely understood by all?
-
3.3 JHA hazards and precautions match?
-
3.4 Quality of JHA steps and hazards?
-
3.5 Other?
4.0 Personal Protection
-
4.1 Proper PPE worn by all workers?
-
4.11 Hi-viz clothing?
-
4.12 Shirts with sleeves and long pants? (No sweatpants)
-
4.13 Proper footwear? Substantial, leather, ankle supporting boots or shoes; no tennis shoes.
-
4.14 Hard hats?
-
4.15 Glasses? Side shields?
-
4.2 Proper gloves in use?
-
4.3 Job-specific PPE as required?
-
4.31 Double eye/face protection (glasses and face shield or goggles) while performing abrasive cutting, chipping, grinding, roto-hammering above waist level, or overhead drilling, cutting or demolition?
-
4.4 Locks and tags in place?
-
4.5 Other?
5.0 Safety Equipment
-
5.1 Fire extinguisher(s) in place?
-
5.2 Fire extinguisher(s) inspections complete?
-
5.3 Eyewash available? Not expired?
-
5.4 First aid kit available?
-
5.5 First aid kit stocked properly?
-
5.6 Other?
6.0 General
-
6.1 Lighting?
-
6.2 Ventilation?
-
6.3 Nails removed from lumber?
-
6.4 List other Sub-Contractors on site?
-
6.5 Other?
7.0 Tools and Equipment
-
7.1 Proper tools in use/used properly?
-
7.2 Guards/safety devices in place?
-
7.3 Tools in good condition?
-
7.4 Other?
8.0 Body Positioning/Movement
-
8.1 Line of fire risk?
-
8.2 Attention to task?
-
8.3 Pinch points?
-
8.4 Proper lifting?
-
8.5 Pushing/pulling under control/balance?
-
8.6 Avoid/protected from sharp edges?
-
8.7 Other?
9.0 Housekeeping
-
9.1 Work areas clean and neat?
-
9.2 Trash cans available/emptied?
-
9.3 Materials properly staged/stored?
-
9.4 Barricades up where applicable?
-
9.5 Barricades maintained?
-
9.6 Other?
10.0 Fall Protection
-
10.1 Floor/wall openings protected?
-
10.2 Guardrails in place?
-
10.3 Warning lines used?
-
10.4 Guardrails/warning lines installed correctly?
-
10.5 100% fall protection over 6' achieved?
-
10.6 Proper fall protection equipment?
-
10.7 Fall protection inspections complete?
-
10.8 Fall Protection Work Plan for work over 6'?
-
10.9 Other?
11.0 Working at Height/Scaffolding/Ladders
-
11.1 Decking complete w/o holes?
-
11.2 Scaffold tag in place/current?
-
11.3 Area below barricaded?
-
11.4 Ladder (portable) inspection complete?
-
11.5 Proper ladder set up?
-
11.5 Proper ladder use?
-
11.6 Ladder extends 3' above landing?
-
11.7 Cage on vertical ladder over 25'? Rest platform(s)?
-
11.8 Other?
12.0 Walking Working Surfaces
-
12.1 Aisles/stairs/floors clear/clean?
-
12.2 Designated walking area?
-
12.3 Holes/depressions guarded?
-
12.4 Other?
13.0 Vehicles/Mobile Equipment
-
13.1 Pre-use inspection complete?
-
13.11 Vehicle lights, horn, etc. operational?
-
13.2 Speed limit and traffic controls followed?
-
13.3 Spotter used when appropriate?
-
13.4 Other?
14.0 Electrical
-
14.1 Assured Grounding complete? Correct color (Q1-white, Q2-green, Q3-red, Q4-orange)?
-
14.2 GFCI use on all power cords/tools?
-
14.3 Panel covers installed? Dead fronts installed?
-
14.4 Panels labeled and unobstructed?
-
14.5 Exposed wiring/knockouts?
-
14.6 Extension cords in good shape?
-
14.7 Cords protected from traffic?
-
14.8 Other?
15.0 Welding/Grinding/Temporary Power
-
15.1 Hoses, leads, cords hung properly?
-
15.2 Welding cables/temp cords free of damage?
-
15.3 Double eye/face protection (glasses and face shield or goggles) while performing abrasive cutting, chipping, or grinding?
-
15.4 Sparks controlled?
-
15.5 Fire watch present?
-
15.6 Fire watch trained?
-
15.7 Other?
16.0 Cranes/Lifting/Hoisting/Rigging
-
16.1 Crane(s) inspected/documented?
-
16.2 Operator NCCCO certificate?
-
16.3 Qualified signal-person? Documentation onsite?
-
16.4 Qualified rigger? Documentation onsite?
-
16.5 Ground is level/firm?
-
16.6 Rigging is inspected/undamaged?
-
16.7 Tag lines/softeners used?
-
16.8 Critical Lift Plan done, if required?
-
16.9 Overhead powerlines considered?
-
16.10 Personnel not under suspended loads?
-
16.11 Other?
17.0 Excavation Work
-
17.1 Locates completed and visible?
-
17.2 Daily inspection conducted?
-
17.3 Daily inspection documented?
-
17.4 Over 4' inspected by competent person?
-
17.5 Excavation shored/sloped/benched?
-
17.6 Spoils pile at least 2' from edge?
-
17.7 Other?
18.0 Confined Space
-
18.1 Attendant trained and alert?
-
18.2 Confined space signs posted at entrance(s)?
-
18.3 Personnel in confined space(s) checked in/out?
-
18.4 Ventilation in place/adequate?
-
18.5 Other?
19.0 Cylinders/Hazardous Materials/Flammables/Combustibles
-
19.1 Flammable/O2 bottles stored separately?
-
19.2 Gas cylinders upright/secured/capped?
-
19.3 Cylinder valves closed when not in use?
-
19.4 Proper storage containers for flammables/combustibles?
-
19.5 Secondary labeling for chemicals?
-
19.6 Hazardous materials survey complete?
-
19.61 Areas of work containing lead identified?
-
19.62 Lead products abated properly?
-
19.63 All other hazardous materials identified?
-
19.64 All other hazardous materials abated properly?
-
19.65 Asbestos containing materials identified?
-
19.66 Asbestos containing materials abated properly?
-
19.7 Other?
20.0 Iterim Life Safety Measures
-
20.1 Signage?
-
20.2 Dust control? Barriers? Penetrations blocked?
-
20.3 Badging?
-
20.4 Fire extinguishers?
-
20.5 Clear stairwells/exits?
-
20.6 Other?
Corrections
-
Section 1. Corrections made? By whom? When?