Title Page
-
Site conducted
-
Project Name
-
Project number
-
Elevation
-
Main Contractor
-
Conducted on
-
Prepared by
-
Location
Audit
-
Sub-straight handed over and in good order.
-
All decks primed correctly.
-
All laps sealed correctly as per manufacturers recommendation.
-
Insulation installed as per construction drawing and insured correct bonding.
-
Membrane is fully bonded and laps are correctly sealed.
-
Peel stops fixed as per manufacturers recommendations.
-
General probe carried out on welds.
-
Full electronic test carried out by independent body.
Signature
-
Installer Signature
-
A2O Signature
-
Client Signature