Title Page
-
Conducted on
-
Prepared by
-
Location
Weko RFDi - Annual PM - Model -RFDi / Serial #525.291251/011 * Use Weko Operations Manual
-
PM Performed By:
-
Select date
-
Check the rotor ball bearing (See chapter 6.9 Manual)
-
Test the indicators (See chapter 6.4 in Manual)
-
Maintenance to be completed when necessary: 1. Exchange the driving belt (See chapter 6.6) 2. Install / uninstall the rotor (See chapter 6.7) 3. Remove impurities / blockages (chapter 6.8) 4. Exchange the rotor ball bearing (chapter 6.11) 5. Exchange the rotor (See chapter 6.11)
-
Comments:
Weko RFDi - Annual PM - Model -RFDi / Serial #505.272664/002 * Use Weko Operations Manual
-
PM Performed By:
-
-
Check the rotor ball bearing (See chapter 6.9 Manual)
-
Test the indicators (See chapter 6.4 in Manual)
-
Maintenance to be completed when necessary: 1. Exchange the driving belt (See chapter 6.6) 2. Install / uninstall the rotor (See chapter 6.7) 3. Remove impurities / blockages (chapter 6.8) 4. Exchange the rotor ball bearing (chapter 6.11) 5. Exchange the rotor (See chapter 6.11)
-
Comments:
Weko RFDi - Annual PM - Model -RFDi / Serial #510.281038/002
-
PM Performed By:
-
Select date
-
Check the rotor ball bearing (See chapter 6.9 Manual)
-
Test the indicators (See chapter 6.4 in Manual)
-
Maintenance to be completed when necessary: 1. Exchange the driving belt (See chapter 6.6) 2. Install / uninstall the rotor (See chapter 6.7) 3. Remove impurities / blockages (chapter 6.8) 4. Exchange the rotor ball bearing (chapter 6.11) 5. Exchange the rotor (See chapter 6.11)
-
Comments:
Perfecta Flat Bed Cutter - Annual PM - Model - Perfecta 92 TVC / Serial #72805 *Use Perfecta Schneid System Manual for reference
-
PM Performed By:
-
Select date
-
Clean entire machine
-
Lubricate grease fitting 14 linear guide ways (See page 3/2 in manual)
-
Lubricate grease fitting 6,11 clamp guide ways (See page 3/2 in manual)
-
Comments: