Title Page
-
Engineer inspected
-
Date inspected
-
WIP inspection conducted by
-
Client
-
Address
-
property Tenanted / Void
Visual inspection List:
-
Engineer Wearing appropriate uniform
-
Uniform clean/presentable
-
Engineer Wearing appropriate PPE
-
Engineer In possession of ID
-
Engineer In possession of torque screwdriver
-
Engineer In possession of Voltage Indicator
-
Engineer In possession of a Lock-Off kit
-
Engineer In possession of a multi-function tester
-
Engineer In possession of a wander lead
-
Equipment/Tolls clean/Presentable
Engineer inspected to conduct the following:
-
Safe isolation procedure (must be checked during all WIP’s
-
Ze
-
Pfc
-
Main protective Bonding Continuity
-
RCD Operation (1/2x , 1x & 5x)
-
Ring-Final continuity
-
R1+R2
-
Zs
-
Insulation resistance
-
Polarity
-
Apply correct torque settings to consumer units terminals
Engineer asked to state any non-compliance’s to BS 7671 & BS 5839-6
-
Can the engineer highlight any code 1 observations
-
Can the engineer highlight any code 2 observations
-
Can the engineer highlight any code 3 observations
-
Can the engineer highlight any non-compliance’s relating to BS 5839-6
Engineer sign and photos
-
Engineer signature
-
WIP Inspector Sign
-
Photos