Title Page
-
Client / Site
-
Equipment Type
-
Prepared by
-
Location
-
Report Date
-
ABB Inc.
Power Products Divison
100 Distribution Circle
Mount Pleasant, PA 15666
Initial Information
1. Technical Job Information
Service Engineer
-
Name
-
Phone Number
-
Email address@us.abb.com
-
Date of Service
-
Date of Report
-
ABB Job Number
Equipment information
-
Customer / Equipment Owner
-
Equipment Location / ID
-
Equipment Location
-
Equipment Type
-
Picture(s) of Equipment or Problem area
-
Equipment Serial Number
-
Year of Manufacture
-
Type of Mechansim
-
Mechanism Serial Numbers
-
Breaker Operation Counter
-
Mechanisms Pump Start Counters
-
Number and outline the problems reported leading up to the visit
Problem
2. Customer Information
-
Customer POC name:
-
Customer POC email address:
-
Customer POC phone number:
-
INSTRUCTIONS:
-------------------------------------
1. Answer the applicable questions below.
2. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
3. Complete audit by providing digital signature.
4. Share your report by exporting as PDF, Word, Excel or Web Link.
3. Situation Found On Site
-
Which Case best describes the on-site situation?
- In Service
- Out of Serice
- Grounded
- Disconnects Open & Locked
- LOTO
- Other
-
Is this an ABB quality defect?
-
What is the source of the Defect?
-
Elaborate on the situation Found On Site
-
Add media
4. Work Performed
-
Detail all work performed on site
-
Please include Pictures
-
Add drawing
-
ABB Test Equipment Used: Click "Add Equipment"
Equipment
-
ABB Test Equipment Used with ID Number
5. Problems/Solutions
-
Has the problem been solved?
-
Describe Additional work that will be necessary. Please Delegate action items accordingly
-
Please add any relevant pictures
-
Add drawing
-
Describe how the problem has been solved
-
Please add any relevant pictures
-
Add drawing
6. Parts and Tools
-
List spare parts used during this service: "Click add Part"
Part
-
Spare part used with Serial or Part Number
-
List Tools and equipment numbers used: "Click add Tool/Equipment"
Tool/Equipment
-
Tools and equipment used
7. Drawings
-
Do any equipment drawings need to be acquired or changed?
-
List the necessary drawings and create an action item
-
List the drawings that need to be revised and create an action item
8. Additional Work
-
Do you recommend additional work at this site?
-
Please detail any additional work that will be necessary and create action items
-
Please Detail any additional parts (if necessary) for this work and create action items
-
Please List any additional customer comments, if necessary
COMPLETION
-
Completed by