Information
-
Client / Site
-
Conducted on
-
Auditor
-
Location
-
Field Engineer Audited
-
ABB Product
Pre-Job Planning and Worksite Awareness
Pre-Job Planning and Worksite Awareness
-
Did the customer provide Site Specific Safety Training?
-
Did FSE perform a Job Safety Analysis with Worksite Examination before starting job?
-
Are site specific hazards documented on the JSA?
-
Please rate the Quality of the JSA (is it complete, detailed, and has signatures of the working team)
-
Please attach a photo of the JSA
-
Did PICW conduct a toolbox safety discussion prior to start of, and/or, change in work scope/activities? (When multiple people are working.)
-
Does FSE know location of muster point in the event of evacuation?
-
Does FSE know location of muster point in the event of inclement weather?
-
Are first aid supplies available and nearest AED location known?
-
Did FSE restrict access to the worksite by using cones / barriers / caution tape?
-
Is access and egress unobstructed?
-
Is the noise level acceptable or has PPE been put in use?
-
Is the lighting adequate in all areas to complete the job?
PPE
Personal Protective Equipment
-
Did FSE remove all jewelry and other exposed metal prior to starting electrical work?
-
Did FSE bring and wear safety glasses?
-
Did FSE wear ABB Branded Arc Rated uniform?
-
Did FSE wear 8 calorie/cm2 (or higher) arc flash clothing at all times while onsite?
-
Was 40 calorie/cm2 (or higher) arc flash clothing and hood available?
-
Did FSE inspect arc flash gear prior to use?
-
Did FSE bring and use balaclava and 8 calories/cm2 or higher face shield? (If needed.)
-
Did FSE bring and inspect leather gloves?
-
Did FSE bring electrically rated rubber gloves? Were electrically rated rubber gloves tested in the last 6 months?
-
Were rubber gloves air tested prior to use?
-
Did FSE wear full leather EH rated work boots?
-
Did FSE use hearing protection when required?
-
Was any additional PPE required to complete this job? (Chemical face shield, chemically rated gloves, head protection, respiratory protection, fall protection, snake chaps, etc.)
Tools & Equipment
Tools & Equipment
-
What is the physical condition of the tool bags & boxes?
-
Has the FSE requested repair or replacement of damanged tool bags or boxes?
-
Please include a picture of the damaged tool bags or boxes
-
Does the FSE have a Fluke T+ Voltage Detector and Proving Unit for Live/Dead/Live (zero voltage verification)
-
Does FSE have insulated tools available?
-
Are insulated tools segregated from other tools?
-
Are insulated tools in good working condition?
-
Were hand and power tools used by the FSE?
-
Were tools inspected prior to use?
-
Ask FSE = What steps do you take to ensure no tools are left in the equipment?
-
Is test / measurement equipment in good working order and calibration valid?
-
Were test equipment and accessories inspected and tested prior to use?
-
Are power tools in good condition, including cords? (including being double insulated or grounded)
-
Are ground fault equipment used and tested to be in good working condition? (GFCI, RCD, ELCB)
Ergonomics
Ergonomics
-
Did FSE use knee pads / mats if in a kneeling position for more than 5 minutes?
-
Was it necessary for FSE to use forceful exertion? Shoulder, elbow, wrist.
-
Was work above shoulder height necessary for an extended period?
-
Was FSE working in an awkward position for an extended period of time without taking microbreaks?
-
Did FSE lift and place using proper back safety procedures and body posture?
-
Is someone available to assist the FSE with heavy lifting of products or parts? (Two Person Lifts >50lbs)
-
Does the FSE have a place to work on the computer (desk or table with chair)?
-
What is the FSE using as a workstation if a desk/table with chair is not available?
-
Please attach a photo
Policies & Procedures
Policies & Procedures. (Were the following company policies followed if used?)
-
Proper Ladder Safety?
-
Work Hours? Has FSE exceed 12 hours more than once in the last 10 days?
Electrical and Lockout/Tagout
Electrical and Lockout Tagout
-
Is the system or facility single line diagram available?
-
Did the FSE review the diagram during LOTO implementation?
-
Are equipment specific lockout procedures available and IN USE?
-
Are lockout devices available along with any required accessories?
-
Have all energy sources been identified and controlled via lock or tag?
-
Did the ABB FSE issue an Electrical Permit To Work (ABB PTW)?
-
Was the permit signed by the customer contact?
-
Please rate the Quality of the Permit (is it complete, detailed, and has signatures of the working team)
-
Do all members of team working on locked equipment have locks applied to equipment or in a group lock box?
-
Is locked equipment verified to be in an electrically safe working condition via appropriate testing means? (Live, Dead, Live, ABB Seven Steps)
-
Did the ABB FSE personally verify zero voltage (Live/Dead/Live test)?
-
Did the FSE use the FLUKE PRV240 Proving Unit, and FLUKE T+Pro voltage detector for "live dead live"/"Zero Voltage Verification"?
Vehicle
-
Is driver's license valid?
-
Is vehicle registration current?
-
Is an emergency roadside kit available?
-
What type of vehicle is the FSE driving?
-
Is vehicle kept in a clean/good condition?
-
Is all maintenance up to date?
-
Are tool bags/boxes, equipment, parts, and materials stored in a safe manner (secured in cargo area or bed of truck)?
-
Comments and Close Out
-
Comments from FE or Auditor?
-
Signature of FSE
-
Signature of auditor
-
Date of Signatures
-
Pictures to be added