Title Page
-
Site conducted
-
Daily Report Date
-
Daily Report Document #
-
Prepared by
-
Site Name
-
Mapped Location
Weather/Site Conditions
-
General Weather
- Sunny - Clear Skies
- Partially Cloudy
- Overcast
- Partial Rain
- Thunderstorms
- All Day Rain
- Snow/Sleet
undefined
-
Temperature
Safety Review
-
Safety Tool Box Talk
- PPE
- Slip/Trip/Fall
- Working from Heights
- Traffic Control on Site
- Emergency Evacuation
- Electrical
- Heat/Cold Stress
- Handling/Storage of Materials/Equipment
- Chemicals
- Hygene
- Hand Tools
- Specific Equipment
- Stand Down
-
PPE Discussed
-
By Whom and Reason
-
Safety High Risk Activities Identified for Today's Scope
-
Safety Risk Desription
-
AHA Provided and Reviewed with Team
-
Safety Impact to Schedule, Scope or Cost
-
# of Days
-
Recovery Plan in Place
-
Describe Impact to Scope
-
Workaround
-
Describe Workaround
Housekeeping Review
-
COVID 19 - Questionnaire/Temperature Check
- Yes
- No
- N/A
-
All Passed
-
The Following Individual(s) did NOT PASS
-
Temperature
-
Sent Away from Site
-
Further Actions/Documentation
-
Describe Action/Documentation
-
Employees On Site
-
Employees
- Tech 1
- Tech 2
- Tech 3
-
Hours Worked
-
Remind Subcontractor to take allowable before and after photos, especially if existing area or items damaged
-
ABM and Subcontractor Rep. to walk work area
-
Remind Subcontractor of Good Housekeeping
-
Identify areas to access using MOP
-
Review Line by Line to ensure materials available and on site before start
-
Reminder of the importance of final cleanup
-
All Main Shut Off valves identified prior to work
-
Must identify what valves shuts off prior to closing with Building Manager
-
Permission to close main valve received prior to working
-
Photos of Existing Conditions if Damage to Finishes (Walls, Floor, Ceiling) , Equipment, Furnishings
-
If Existing Conditions Damaged - Describe
-
Area and Description
Subcontractor Cooling Tower Refurbishment
-
AHU Refurbishment
-
LOTO
-
Lock Out To Begin Scope
-
Lock Out Removed When Scope Complete
-
Cleaning Coils
-
Repair or Replacement of Pan
-
Repairs to Pan
-
Replacement of Pan
-
Cleaned and Coated
-
Condition of coils and pan pre-installation
-
Insulation
-
Condition of insulation pre-installation
-
Concerns with insulation
-
Brief Scope of Work Completed Today
-
AHU #
Rocks in the Road
-
Rocks in the Road Considerations
-
Item 1
-
Item 2
-
Item 3
Materials Delivered to Site
-
Deliveries
-
Item 1
-
Item 2
-
Add media
Inspection/Testing - Refurbishment AHU
-
AHU
-
# and location
-
# and location
-
Type of Inspection/Testing
- ABM Rep. Inspection Prior to Work Performed
- ABM Rep. Inspection After Work Performed
Visitors to Site
-
Visitor(s) to Site Name and Company
-
Name and Company
-
Name and Company
-
Name and Company
Additional Photos
-
Add media