Title Page

  • Pick a Location

  • Conducted on

  • Prepared by

  • Location

ASSET

  • Parking Lot issues- pot holes/striping

  • All Exterior lights working- building and pole lights

  • Sidewalks clean; no safety issues

  • Dumpster Area- doors functional/clean/shut

  • Landscaping- cut/no dead shrubs/ nothing touching building

  • DT menuboard is clean? look fors: ensure no cracks/scratches <br>

  • DT speakerpost- clean; OCB functioning

  • Canopy/clearance bar- clean and not damaged

  • Interior lighting working (FOH and BOH)

  • Ceiling tile damage/stains/missing (FOH and BOH)

  • Any tile or baseboard issues/grout (FOH and BOH)

  • All equipment working (ask team member)

  • Verify Smallwares (cheese pumps/hinges- LTO items)<br>

  • Confirm all maintenance items from CORE completed

  • POP- verify POP placement per roadmap

SERVICE- Conduct DT Shop / Fundamentals /

SERVICE- Conduct DT Shop

  • Feel of the service champion energy vs functional

  • Order/Window procedures followed

  • TRED being executed?

  • Food Love- Line procedures (1 hour observation/coaching)

  • 28 day trend SWS avg.

FUNDAMENTALS

  • Cleanliness of unit- is system in place (zone cards/square 1)<br>

  • Deployment correct?- Immediate corrective action if not

  • Prep guide- initialed and verify quantities

PEOPLE

  • Training calendar posted/verified (ask team member)

  • Staffing/Bench- review progress from bench discussion

  • Culture Check- communication board/feel/crew app usage

  • Leadership- IS MIC coaching/leading the shift/MIC zone

  • Current number of certified managers from LZ report _____

  • How many are certified?

  • Why, and who still needs to be certified, by when?

  • How many are certified?

FINANCIALS

  • Review of cash mgmt.

  • review posted schedule- is it what you approved?

  • ICOS report communicated- is team aware of focus items

DISSATISFACTION

  • Is team aware of focus area and steps to correct from

  • Period Coaching report?

  • Current dissatisfaction %PTD

  • Current dissatisfaction %YTD

BIG TWO

BIG TWO

  • 2 commitments to address top 2 issues focused on system execution following SMART criteria

Example

  • 1. Food Love- Line procedures not being followed MIC needs to follow correct deployment to verify proper builds and finished product- immediately re-train all FCs on proper rock and roll for quesadillas 8/12 - re-train all FCs on two hand stuff method- 8/12. 2. Square one not being executed RGM to review program with all mgmt by 8/4/22 and have daily follow-up to ensure execution with accountability.

MISC./To Do Items

  • Completed today 1. patched pot hole in DT and called Billings paving for saw cut/patch
    2. Called Tim's Landscaping to come mow- will be here tomorrow
    3. Posted schedule for upcoming week
    4. Posted Period Coaching report

Items that need to be completed

  • 1. Order retherm handle and paddle from RSCS by 8/1 tomorrow and e-mail me the confirmation. 2. Replace the two stained ceiling tiles by the 3-comp sink by Saturday. 3. Sally's LZ needs to be re-scheduled and caught up. Follow-up on training calendar execution with jr mgmt. daily

  • This section for first of BIG TWO items (required)

  • This section for second of BIG TWO items (required)

  • AC Routine Visit for this location completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.