Title Page
-
Document No:
-
Customer
-
Site Address
-
Date
-
Arrival Time
Inspection
-
System make & Model number
-
Next Inspection Due
-
% of system tested
-
Any faults reported by the customer?
-
List of faults reported by customer
System Test & Inspected
-
General State of System
-
Check number & Reader type matches System 'As Fitted'
-
Check correct operation of ALL readers and door controllers
-
Check satisfactory operation of all door locks/maglocks
-
Check cables and Conduits are supported and undamaged
-
Check all flexible connections
-
Check all PSU's for correct operation
-
PSU location & voltage
-
Check A/h capacity of batteries and charge current
-
Battery location, Size, Date & Ah
-
Check the operation of any 'Door Open' alarms
-
Check operation of any 'Forced Entry' alarms
-
Check doors for correct alignment & record any deficiency for customer attention. (Not part of Cura contract to re-align doors)
-
Check door closers for correct operation & record any deficiency for customer attention. (Not part of Cura contract to adjust)
-
Check programming computer / system monitor is operating correctly
-
Check intercom voice / video has clear communication
Documentation for Site / System
-
System Log Book Present
-
Log Book up to Date
-
All Recorded Faults Rectified
Test Completion
-
Test Result
Signature
-
Engineers Signature
-
Customer Signature