Information
-
Site conducted
-
Client / Site
- Equans/Engie
- HG Construction
- Wates
- Barratts
- Mullaly
- Durkan
- JerramFalkus
- Farrans
- Higgins
- Other
-
Conducted on
-
Prepared by
-
Investigator(s)
-
Type of occurrence
-
Investigation level
-
Time and Date of the occurrence
-
Name of injured party
-
Details of Injury?
- Head
- Eye
- Arm
- Trunk
- Hand
- Leg
- Feet
-
Nature of Injury?
- Sprain, strain, fracture or break.
- Open wound, cut or abrasion
- Bruising
- Burns and scalds
- Concussion
- Amputation
- Hernias, slipped disc or back
- Property damage
- RIDDOR
-
First aid treatment?
-
Details of first aid treatment?
Investigation findings
-
Location of incident
-
Training and documentations records
-
Entry in accident book.
-
Risk Assessment and Method Statement-(RAMS) in site & signed the record sheet.
-
Permit to work.
-
Other.
-
What task was being carried out?
-
What plant and equipment was used for the task?
-
Immediate Cause
-
Underlying Cause
-
Root Cause
-
Were the emergency services called?
-
Details
Investigation and reporting
-
Is the incident reportable under RIDDOR? (injured party taken from site to hospital, injury or work related illness resulting in more than 7 days off work, specified dangerous occurance
-
What corrective action can you take to prevent reoccurrence?
-
Does the occurrence require further investigation? (Please contact ESS SHEQ Department on 01708867609 immediately and leave as much of the scene un touched as possible, take photographs of the scene)
-
Signature of injured party or representative
-
Investigator Signature