Cover Sheet

  • Accompanied audit conducted by

  • Engineer Name

  • Conducted on

  • Location

Engineer KPI performance Status

  • Review KPI the individual performance metric scores and record current status

  • Record which metrics are in need of focus and proposed actions to re-address the score value

PPE Audit

  • Audit and inspect the engineer’s PPE. Indicate the items in their possession.

  • Are any Items of PPE missing or need replacing?

  • Enter the required PPE and create a follow up task to replace

  • Is the PPE appropriate and fitted for the individual?

  • Is the engineer aware of the function and limitation of each item of PPE

Engineer vehicle condition

  • Is the Vehicle service schedule up to date?

  • IT'S A COMPANY REQUIREMENT THAT ALL COMPANY VEHICLES ARE SERVICED IN LINE WITH THE SCHEDULE, FAILURE TO DO SO COULD RESULT IN DISCIPLINARY ACTION.

  • Is the engineers Vehicle in a clean state both inside and out?

  • IT IS A COMPANY REQUIREMENT THAT ALL COMPANY VEHICLES ARE KEPT CLEAN AND MAINTAINED INLINE WITH THE LEASE COMPANY FAIR WEAR AND TARE POLICY, FAILURE TO DO THIS COULD LEAD TO DISCIPLINARY ACTION AND COSTS FOR REPAIR CAN BE LEVIED TO THE USER.

  • Is the Vehicle First Aid Kit. Complete and all items within the USE BY date?

  • The First Aid Kit is provided for your own personal safety and it's content is the responsibility of the individual, any used item MUST be replenished at the earliest opportunity

Administration records:

  • Has the engineer submitted weekly Overtime Claims consistently and accurately

  • WEEKLY TIME SHEETS ARE REQUIRED TO ENSURE OPEX IS ACCURATELY MONITORED AND CONTROLLED WITHIN THE CHANNEL BUDGET, DELAYED CLAIMS MAY NOT BE RECOGNISED FOR PAYMENT AT THE DISCRETION OF THE CHANNEL SERVICE MANAGER.

  • Has the engineer submitted an Expense Claim in the last 2 months?

  • PLEASE TAKE NOTE THAT THE FINANCE DEPARTMENT WILL NOT CONSIDER CLAIMS VALID WHEN THEY ARE IN EXCESS OF 2 CALENDAR MONTHS OLD, IT'S A REQUIREMENT THAT ALL EXPENSE CLAIMS ARE SUBMITTED WITH VAT RECEIPTS IN A TIMELY MANNER.

Training and Development Records

  • Have you completed any training since the last review, Technical, Systems, H&S, interpersonal skills.

  • Record the Format of Training

  • Have you updated your personal Training Matrix?

  • Record the date that the update will be completed.

  • Are there specific training needs that the engineer would benefit from attending

  • Please detail the training type and level required.

  • Is the identified training available in-house from the Domino Business Unit?

  • Using the appropriate interface record the training request and once confirmed schedule the training via the despatch console

  • Identify a suitable external course that is available and submit a cost justification to schedule the course.

Onsite Protocol Adherance.

  • Is the AEE evaluation being completed on the customer site

  • Has the "Call Ahead" been conducted prior to the visit?

  • Discuss the benefits of Call Ahead to both the customer and Domino and document the current run rate % for Call Ahead from the KPI Data review.

  • Did the engineer sign in and liaise with the site contact to qualify the scope of work & any production restrictions?

  • Discuss the need to communicate arrival / departure and inform the site contact of the planned work

  • Has the engineer reviewed the account history and any site specific requirements?

  • Preparation for all WO activity is crucial to ensure an effective and efficient outcome from the visit.

  • Did the engineer prepare the work area & assess the specific application

  • Discuss the personal responsibility for Risk Assessment and correct SHE compliance and the need for good housekeeping when conducting work on a customers premises. Work through a Dynamic Risk Assessment using the template.

    no label
  • Did the engineer assess / confirm the billing type?

  • Consideration of the billing type is required at the point of securing the customers signature as revenue and cost control is central to the field service activity.

  • Did the engineer have the correct tools and spares available?

  • List the missing items that should have been available to ensure a positive intervention, create a follow up action with a suitable completion date to address the issue

  • Did the engineer have sufficient knowledge and experience to complete the work

  • List details of the knowledge gap and agreed actions to bridge this in the future, include exposure commitments for improving the engineers experience with the technology.

WO Service Report Quality and feedback.

  • Audit two recent Service Reports with the engineer, include one installation WO and one Repair WO, discuss the accuracy and quality of the report and the benefit of submitting reports with good data and detail

  • Record the WO number and customer account name.

  • Job Type reviewed

  • Has the call ahead activity & on-site labour time been captured against the WO T&M Lines.

  • Discuss the metric that is used to record the Call Ahead activity and the benefit of confirming ETA & line access with the customer in advance of travelling to site. Record the current Call Ahead value and the on-target values for future review.

  • Reviewing the Service Report Work Description, has sufficient detail been included in the text summary?

  • Discuss recommended changes to the report content and explore whether developing body text templates for specific technologies or activities might aid improvements

  • Has the engineer included reference to the Generic Risk Assessment or attached a Dynamic RA.

  • REFERENCE TO RAM'S WITHIN ALL CUSTOMER SERVICE REPORTS IS A BUSINESS REQUIREMENT.

  • Was a Customer Signature captured on the Service Report.

  • A SIGNATURE FROM THE CUSTOMER REPRESENTATIVE IS CRUCIAL FOR THE BUSINESS TO LEGALLY INVOICE AGAINST THE T&M LINES

  • Record the WO number and customer account name being reviewed

  • Job Type reviewed

  • Has the call ahead protocol been followed and the activity time captured on the WO T&M Lines.

  • Discuss the metric that is used to record the Call Ahead activity and the benefit of confirming ETA & line access with the customer in advance of travelling to site. Record the current Call Ahead value and the on-target values for future review.

  • Reviewing the Service Report Work Description, has sufficient detail been included in the text summary?

  • Discuss recommended changes to the report content and explore whether developing body text templates for specific technologies or activities might aid improvements

  • Has the engineer included reference to the Generic Risk Assessment or attached a Dynamic RA.

  • REFERENCE TO RAM'S WITHIN ALL CUSTOMER SERVICE REPORTS IS A BUSINESS REQUIREMENT.

  • Was a Customer Signature captured on the Service Report.

  • A SIGNATURE FROM THE CUSTOMER REPRESENTATIVE IS CRUCIAL FOR THE BUSINESS TO LEGALLY INVOICE AGAINST THE T&M LINES

Commercial Activity

  • Has the engineer communicated business intelligence?

  • Has the engineer identified leads for capitol equipment

  • Has the engineer identified Planned Maintenance work?

  • Has the engineer identified minor repair opportunities?

  • Has the engineer identified customer training opportunities?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.