Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Pre-Work
-
1.1. Job Safety Analysis (JSA) completed, understood and signed by each employee in assigned work area?
-
1.2. JSA posted in conspicuous place at task area?
-
1.3. MSDS Sheets obtained, reviewed and understood?
-
1.4. All required permits obtained and signed off?
-
1.5. Lock Out / Tag Out needed / completed for work to be performed?
2. Personal Protective Equipment (PPE)
-
2.1. Hard Hats worn by all employees
-
2.2. Face Shields: Grinding / Overhead Drilling / Splash Hazards etc.
-
2.3. Appropriate gloves for task(s)
-
2.4. Safety Glasses - No shaded / tinted glasses indoors.
-
2.5. Hearing Protection
-
2.6. Appropriate work boots
-
2.7. Reflective Vest or High Visibility Clothing
3. Fall Protection
-
3.1. Fall Exposures greater than 6 feet
-
3.2. Personal Fall Arrest System properly worn / inspected
-
3.3. Floor openings greater than 2 inches in diameter protected with appropriate cover, secured and labeled "HOLE"
-
3.4. Guardrail System in place, inspected and installed correctly
-
3.5. Leading edge protected, controlled access zone set up 6 feet from edge, warning markers clearly visible and "FALL PROTECTION REQUIRED BEYOND THIS POINT" signage in place. Monitor with sign in / out log posted.
-
3.6. Horizontal Life lines installed / used properly
-
3.7. Wall openings guarded
4. Ladders and Scaffolding
-
4.1. Ladder(s) in good condition, no accumulation of mud, oil, grease or other hazardous material
-
4.2. Area at base of ladder(s) kept clear
-
4.3. Extension Ladder(s) set up properly (4:1 ratio), secured (cleated, if need be and tied off), and if used as access to next level, extends 3 feet above platform or grab rails installed.
-
4.4. Step ladder(s) used only in open, locked position
-
4.5. Scaffold(s) complete
-
4.6. Scaffold(s) inspected, current date and signed off by competent person
-
4.7. Scaffold(s) in good repair, no damaged components or improper planking
-
4.8. Access to scaffold(s) adequate
5. Housekeeping
-
5.1. Material stacked and orderly
-
5.2. Trash cans in work area(s), emptied daily or when full
-
5.3. Debris removed
-
5.4. Nails or other hazardous protrusions removed or hammered back to eliminate hazard(s)
-
5.5. Cords, hoses, leads or other tripping hazards off the floor (7 feet up) or set up in such a way to not create a tripping hazard or damage cords
-
5.6. Access / egress maintained.
-
5.7. Other
6. Hot Work / Welding / Cutting / Grinding
-
6.1. Proper permits obtained, complete and signed off
-
6.2. Fire extinguisher no more than 10 feet away from work area, inspected, properly charged and correct type
-
6.3. Adjacent work protected
-
6.4. Hard Hats with Welding Hoods and Safety Glasses
-
6.5. Combustibles removed / protected
-
6.6. Burning goggles
-
6.7. Grinding: full face shield with safety glasses
-
6.8. Adequate ventilation
-
6.9. Proper gas storage / protected
-
6.10. Equipment in good condition
7. Mobile Equipment
-
7.1. Operator(s) certified / trained on particular equipment being used
-
7.2. Equipment inspected
-
7.3. Fall Protection / seat belts used properly
-
7.4. Work area below barricaded
-
7.5. Spotters used
-
7.6. Other
8. Excavations
-
8.1. Competent person on site
-
8.2. Excavation Daily Report Complete
-
8.3. Employee(s) trained
-
8.4. Shored / sloped / benched properly based on soil type and condition
-
8.5. Proper access / egress
-
8.6. Ladder(s) within 25 feet of all exposed employees
-
8.7. Spoils piles and materials 2 feet back from top of excavation
-
8.8. Excavation barricaded and signs posted
-
8.9. Excavation illuminated if left open overnight in a pedestrian area
-
8.10. Excavation atmosphere tested? Results:
9. Electrical
-
9.1. Cords inspected and properly color coded for month
-
9.2. GFCI(s) inspected and monthly record on file
-
9.3. Cords routed to not create a trip hazard or 7 feet off ground
-
9.4. Cords exposed to mobile equipment
-
9.5. Cords hung by conductive materials such as nails, tie wire or welding rods
10. Hazardous Chemicals
-
10.1. Unsafe storage location (flammables near ignition sources, sparks or flame, spills could enter storm drains)
-
10.2. Spill Kit(s)
-
10.3. Safety Data Sheets for all chemicals on site (including sub-contractors)
-
10.4. Excessive quantities stored on site on in vehicle.
-
10.5. Adequate / proper PPE
-
10.6. Adequate storage containers (including gas cans, all chemicals labeled in accordance with GHS standards)
Corrective Actions and Date(s) to complete by
-
All Corrective Action Items To Be Completed By:
Sign Off
-
Inspection Performed By:
-
On Site Representative