Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous Inspection
-
Previous Inspection reviewed by PM and Project Superintendent
-
Any Corrective Actions still open
Pre-Work
-
Job Safety Analysis (JSA) completed, understood and signed by each employee in assigned work area?
-
JSA posted in conspicuous place at task area?
-
MSDS Sheets obtained, reviewed and understood?
-
All required permits obtained and signed off?
-
Lock Out / Tag Out needed / completed for work to be performed?
Personal Protective Equipment (PPE)
-
Hard Hats worn by all employees
-
Face Shields: Grinding / Overhead Drilling / Splash Hazards etc.
-
Appropriate gloves for task(s)
-
Safety Glasses - No shaded / tinted glasses indoors.
-
Hearing Protection
-
Appropriate work boots
-
Reflective Vest or High Visibility Clothing
Fall Protection
-
Fall Exposures greater than 6 feet
-
Personal Fall Arrest System properly worn / inspected
-
Floor openings greater than 2 inches in diameter protected with appropriate cover, secured and labeled "HOLE"
-
Guardrail System in place, inspected and installed correctly
-
Leading edge protected, controlled access zone set up 6 feet from edge, warning markers clearly visible and "FALL PROTECTION REQUIRED BEYOND THIS POINT" signage in place. Monitor with sign in / out log posted.
-
Horizontal Life lines installed / used properly
-
Wall openings guarded
Ladders and Scaffolding
-
Ladder(s) in good condition, no accumulation of mud, oil, grease or other hazardous material
-
Area at base of ladder(s) kept clear
-
Extension Ladder(s) set up properly (4:1 ratio), secured (cleated, if need be and tied off), and if used as access to next level, extends 3 feet above platform or grab rails installed.
-
Step ladder(s) used only in open, locked position
-
Scaffold(s) complete
-
Scaffold(s) inspected, current date and signed off by competent person
-
Scaffold(s) in good repair, no damaged components or improper planking
-
Access to scaffold(s) adequate
Housekeeping
-
Material stacked and orderly
-
Trash cans in work area(s), emptied daily or when full
-
Debris removed
-
Nails or other hazardous protrusions removed or hammered back to eliminate hazard(s)
-
Cords, hoses, leads or other tripping hazards off the floor (7 feet up) or set up in such a way to not create a tripping hazard or damage cords
-
Access / egress maintained.
-
Other
Hot Work / Welding / Cutting / Grinding
-
Proper permits obtained, complete and signed off
-
Fire extinguisher no more than 10 feet away from work area, inspected, properly charged and correct type
-
Adjacent work protected
-
Hard Hats with Welding Hoods and Safety Glasses
-
Combustibles removed / protected
-
Burning goggles
-
Grinding: full face shield with safety glasses
-
Adequate ventilation
-
Proper gas storage / protected
-
Equipment in good condition
Mobile Equipment
-
Operator(s) certified / trained on particular equipment being used
-
Equipment inspected
-
Fall Protection / seat belts used properly
-
Work area below barricaded
-
Spotters used
-
Other
Excavations
-
Competent person on site
-
Excavation Daily Report Complete
-
Employee(s) trained
-
Shored / sloped / benched properly based on soil type and condition
-
Proper access / egress
-
Ladder(s) within 25 feet of all exposed employees
-
Spoils piles and materials 2 feet back from top of excavation
-
Excavation barricaded and signs posted
-
Excavation illuminated if left open overnight in a pedestrian area
-
Excavation atmosphere tested? Results:
Electrical
-
Cords inspected and properly color coded for month
-
GFCI(s) inspected and monthly record on file
-
Cords routed to not create a trip hazard or 7 feet off ground
-
Cords exposed to mobile equipment
-
Cords hung by conductive materials such as nails, tie wire or welding rods
First Aid Facilities
-
Are First Kit(s) / Cabinets clean and orderly and properly stocked
-
Contents expired
-
First Aid Kit(s) / Cabinets readily accessible
-
Are trained First Aid Personnel on site
-
Are emergency numbers / maps / locations displayed
Work Environment
-
Adequate amenities (toilets, break areas, etc)
-
Proper ventilation
-
Access / egress to work area adequate. (no change in elevation greater than 19", adequate exits)
-
Stairways / emergency exits clear
-
Insufficient lighting
-
Sound Level
Corrective Actions and Date(s) to complete by
Sign Off
-
Inspection Performed By:
-
On Site Representative