Title Page
-
Document No.
-
Site number and location
-
Site Address
-
Client
-
Conducted on
-
Inspector name
-
Site ganger
-
Contracts Manager
Corrective Actions
Corrective Actions
-
Are there any actions outstanding from previous audit?
-
Are there any actions from this audit?
1. Project/site management requirements
-
Are ACS Principle Contractor?
-
is the F10 on display in a prominent position?
1.1. Site arrangements
-
Are site arrangements compliant?<br><br>- Is the site secure from unauthorised access?<br>- Is safe access and egress provided?<br>- Is adequate safety signage provided?<br>- Are adequate welfare facilities provided and maintained?<br>- Are all sub contractors vetted for addition to the Approved Contractors Register?<br>- Is there adequate provision for vehicle/pedestrian segregation<br>- Are walkways and vehicle routes in good condition and maintained?<br>- Are people wearing mandatory and applicable PPE?<br>- Of the PPE checked, was it in good condition?<br>- Is housekeeping in ACS work areas satisfactory?<br>
-
1.1.1. Is the site secure from unauthorised access?
- YES
- NO - Fencing unsecured
- NO - Gates left open
- NO - Subject to Vandalism
- NO - Other response
- N/a
-
1.1.2. Is safe access and egress provided?
-
1.1.3. Is adequate safety signage provided?
-
1.1.4. Are adequate welfare facilities provided and maintained?
- Yes
- NO - No facilities in place
- NO - Insufficient facilities
- NO - Poorly maintained facilities
- NO - Other response
- N/a
-
1.1.5. Are all sub contractors vetted for addition to the Approved Contractors Register?
-
1.1.6. Is there adequate provision for vehicle/pedestrian segregation
-
1.1.7 Are walkways and vehicle routes in good condition and maintained?
-
1.1.8. Are people wearing mandatory and applicable PPE?
-
1.1.9. Of the PPE checked, was it in good condition?
-
1.1.10. Is housekeeping in ACS work areas satisfactory?
1.2. Documentation
-
Is documentation in place and in date?<br><br>- Construction Phase Plan in place and in date?<br>- Have all personnel received site induction?<br>- Are Toolbox Talks being held at least once a fortnight?<br>- Is there a Traffic Management Plan in place?<br>- Are safe systems of work (RAMS) in place for the range of activities taking place?<br>- Are maintenance and servicing records readily available?<br>- Are registers and records being completed and up to date?
-
1.2.1. Construction Phase Plan in place and in date?
-
1.2.2. Have all personnel received site induction?
-
1.2.3. Are Toolbox Talks being held at least once a fortnight?
-
1.2.4. Is there a Traffic Management Plan in place?
-
1.2.5. Are safe systems of work (RAMS) in place for the range of activities taking place?
-
Are there RAMS on site?
-
Are the RAMS in date?
-
Are the RAMS correct /applicable?
-
Are Subcontractor RAMS not on site?
-
1.2.6. Are maintenance and servicing records readily available?
-
1.2.7. Are registers and records being completed and up to date?<br><br>- mobile plant daily checks<br>- PUWER weekly register<br>- LOLER weekly register<br>- weekly excavation records<br>- HAVS register
-
Are mobile plant daily checks up to date?
-
Are HAVS registers up to date?
-
Are LOLER registers up to date?
-
Are PUWER registers up to date?
-
Are excavation records kept up to date?
1.3. Emergency Arrangements
-
Are emergency arrangements satisfactory?<br><br>- Are there adequate Fire and Emergency resources in place? <br>- Are there adequate 1st aid personnel and resources on site?
-
1.3.1. Are there adequate Fire and Emergency resources in place?
-
Is there a sufficient quantity fire extinguishers?
-
Is there a fire warden?
-
Is the fire assembly point and route clear and sign posted?
-
1.3.2. Are there adequate 1st aid personnel and resources on site?
-
Are there sufficient 1st aid personnel?
-
Are there sufficient 1st aid resources?
2. Excavators
2.1. Excavator Safety
-
Are excavators provided, used and maintained in a safe condition?<br><br>- Are certificates of thorough examination readily available?<br>- Is there provision for the operator to have all round vision?<br>- Is there a sign for the type of quick hitch and safety pin requirements displayed on the dipper arm?<br>- Is the flashing beacon working and being used?
-
2.1.1. Are certificates of thorough examination readily available?
-
2.1.2. Is there provision for the operator to have all round vision?
-
2.1.3. Is there a sign for the type of quick hitch and safety pin requirements displayed on the dipper arm?
-
2.1.4. Is the flashing beacon working and being used?
2.2. Lifting Operations
-
If used for lifting operations, are arrangements in place to plan and carry out the task safely?<br><br>- Is there a lift plan in place for the activity?<br>- If lifting in excess of 1tonne are there boom hose burst check valves fitted?<br>- SWL display on dipper or in cab?<br>- Do people involved in the lifting operation carry the correct competences? (ie Lifting ops, slinger - If no mark in training section.)
-
2.2.1. Is there a lift plan in place for the activity?
-
2.2.2. If excavator used for lifting operations in excess of 1tonne are there boom hose burst check valves fitted?
-
2.2.3 Is SWL on display on dipper arm or in cab?
-
2.2.4 Do people involved in the lifting operation carry the correct competences? (ie Lifting ops, slinger - If no mark in training section.)
3. Dumpers/Ride On rollers
-
Are dumpers/rollers provided, used and maintained in a safe condition?<br><br>- Is roll over protection bar upright and locked in position?<br>- Are all lights functional (headlights, brake, tail, reversing and flashing amber lights)?<br>- Is seat belt functional and being used by operator when driving?<br>- Is drivers seat secure and adjuster functioning?<br>- Are wheels and tyres fit for use (treads, pressures, side walls, wheels and wheel nuts)?<br>- If none in use, are you satisfied that there is no sign of seat belt not being used? (ie seatbelt clipped in whilst parked up)
-
3.1.1. Is roll over protection bar upright and locked in position?
-
3.1.2. Are all lights functional (headlights, brake, tail, reversing and flashing amber lights)?
-
3.1.3. Is seat belt functional and being used by operator when driving?
-
3.1.4. If not in use, are you satisfied that there is no sign of seat belt not being used? (ie seatbelt clipped in whilst parked up)
-
3.1.5. Is drivers seat secure and adjuster functioning?
-
3.1.6. Are wheels and tyres fit for use (treads, pressures, side walls, wheels and wheel nuts)?
4. Hand held power tools
-
Are hand held power tools provided, used and maintained in a safe condition?<br><br>- Are daily/before use checks carried out by operatives?<br>- Is the equipment fit for purpose (worn abrasive wheels, chisels, bits, plates etc.)?
-
4.1.1. Are daily/before use checks carried out by operatives?
-
4.1.2. Is the equipment fit for purpose (worn abrasive wheels, chisels, bits, plates etc.)?
5. Excavations
5.1. Excavation Safety
-
5.1.1. Are Excavations safe?<br><br>- measures to prevent collapse<br>- measures to prevent falls from height<br>- temporary works<br>- measures to prevent water build up
-
Are there suitable measures are not in place to prevent excavation wall collapse (batters, steps, shoring, boxes etc.)?
-
Is there anything in place to prevent water build up to trench floors (covers, sumps, pumping etc.)?
-
Are elements of excavation works which are classified as temporary works being managed appropriately (Temporary works co-ordination, design brief, design, design checks, permit to erect/dismantle, Temporary works supervisor etc.)?
-
Are there measures in place to prevent people and/or plant from falling into the excavation (covers, road plates, barriers, blocks etc.)?
5.2. Buried services
-
5.2.1. Have the Golden Rules been followed?<br><br>- excavation work compliant with HSG 47
-
Has G been followed? G Gather the relevant information from Statutory Providers service drawings, carry out visual survey to see if there’s anything missing on the drawings. SPEN/SGN must be contacted and invited to site whenever we will be working near HV cables or Medium/High pressure gas pipes
-
Has O been followed? O Obtain and assess competence of the people doing the work?
-
Has L been followed? L Locate services using CAT and Genny
-
Has D been followed? D Demarcate all services found with paint or markers on the ground
-
Has E been followed? E Ensure ACS or Client Permit to dig/excavate/break ground and relevant RAMS are in place before you to commence any further. The site supervisor must brief the Safe System of Work to all involved in the work
-
Has N been followed? N Now hand dig enough trial holes to confirm location and depth of identified services
-
Has R been followed? R Review service drawings to confirm that all services marked have been found and located
-
Has U been followed? U Use safe digging practices at all times, CAT scan every 200mm of digging to ensure there’s nothing else in the ground that wasn’t originally found.
-
Has L been followed? L Leave at least 500mm distance between mechanical plant and any live service
-
Has E been followed? E Ensure the works are supervised by a competent person at all times. If supervisor has to leave site for any reason then stop works.
-
Has S been followed? S Stop digging if you find anything unexpected i.e. concrete encased cables. Carry out a Point of Work Risk Assessment and decide on the safest way forward before recommencing.
-
5.2.2. Are there correct hand tools available for safe digging to take place?
6. Confined Spaces
-
6.1. Is confined space working safe?<br><br>- trained persons<br>- Risk assessment in place and briefed<br>- Permit to enter confined space in place<br>- Gas/oxygen testing and monitoring in place<br>- Emergency rescue equipment in place<br>- Emergency 1st Aider present
-
Have Personnel have had confined space training?
-
Is there Risk assessment in place and briefed?
-
Is there a Permit to enter confined space in place?
-
Is there Gas/oxygen testing and monitoring in place?
-
Is there Emergency rescue equipment in place?
-
Is there an Emergency 1st Aider present?
7. COSHH
7.1. Use of Substances
-
Are workers protected from substances hazardous to health?<br><br>- Are COSHH assessments available for all hazardous substances used on site?<br>- Have all personnel likely to be exposed to hazardous substances been briefed on the COSHH Assessments and controls?<br>- Have all operatives working with COSHH items been provide with specific and suitable PPE?<br>- Are flammable liquids and gases stored securely and away from sources of ignition?
-
7.1.1. Are COSHH assessments available for all hazardous substances used on site?
-
7.1.2. Have all personnel likely to be exposed to hazardous substances been briefed on the COSHH Assessments and controls?
-
7.1.3. Have all operatives working with COSHH items been provided with specific and suitable PPE?
-
7.1.4. Are flammable liquids and gases stored securely and away from sources of ignition?
7.2. Dust
-
Are people protected from dust?<br><br>- measures been taken to avoid the creation of dust (guillotines, pre cut slabs/ blocks/kerbs/bricks etc.)?<br>- personnel been briefed on the risks and controls of general dust and Respirable Crystalline Silica?<br>- Are suitable water suppression units provided and used (avoid the use of gravity fed water containers)?<br>- Is suitable respiratory protection provided and used ( FFP 3 disposable or half face masks)?<br>- Have all operatives at risk been face fit tested for the RPE being used?<br>- Are all operatives using RPE clean shaven?<br>- Is the correct additional PPE worn for use of Stihl Saw? (ie. Safety goggles (not glasses) and hearing protection)
-
7.2.1. Have all measures been taken to avoid the creation of dust (guillotines, pre cut slabs/ blocks/kerbs/bricks etc.)?
-
7.2.2. Have all personnel been briefed on the risks and controls of general dust and Respirable Crystalline Silica?
-
7.2.3. Are suitable water suppression units provided and used (avoid the use of gravity fed water containers)?
-
7.2.4. Is suitable respiratory protection provided and used ( FFP 3 disposable or half face masks)?
-
7.2.5. Have all operatives at risk been face fit tested for the RPE being used?
-
7.2.6. Are all operatives using RPE clean shaven?
-
7.2.7. Is the correct additional PPE worn for use of Stihl Saw? (ie. Safety goggles (not glasses) and hearing protection)
8. Vibration
-
Are workers protected from vibration?<br><br>- Does the vibrating tool in use have the lowest vibration magnitude available?<br>- Is the use of vibrating tools the safest method to carry out the task?<br>- Have all personnel been briefed on early signs and symptoms of HAVS and control measures to prevent over exposure?<br>- Are vibration emissions marked on vibrating tools?<br>- Are all operatives aware of vibration data and acceptable trigger times for vibrating tools they are using?
-
8.1.1. Does the vibrating tool in use have the lowest vibration magnitude available?
-
8.1.2. Is the use of vibrating tools the safest method to carry out the task?
-
8.1.3. Have all personnel been briefed on early signs and symptoms of HAVS and control measures to prevent over exposure?
-
8.1.4. Are vibration emissions marked on vibrating tools?
-
8.1.5. Are all operatives aware of vibration data and acceptable trigger times for vibrating tools they are using?
9. Manual Handling
-
9.1 Are manual handling activities carried out safely?<br><br>- Mechanical handling equipment available and in use?<br>- carried out taking cognizance of T.I.L.E (Task, Individual, Load, Environment)
-
9.1.1. Mechanical handling equipment available and in use?
-
9.1.2 Are tasks being carried out taking cognizance of T.I.L.E (Task, Individual, Load, Environment)
10. Noise
-
10.1 Are people protected from noise?<br><br>- Does equipment have noise emission data or warnings marked or labelled?<br>- Are people are wearing mandatory and applicable PPE?
-
10.1.1 Does equipment have noise emission data or warnings marked or labelled?
-
10.1.2. Are people are wearing mandatory and applicable PPE?
11. Training
-
11.1. Have all training requirements been met?
-
Is there SMSTS/SSSTS?
-
Is there Temporary Works?
-
Is there Confined Spaces?
-
Is there Dumper/Roller?
-
Is there First Aid?
-
Is there Cat & Gen?
-
Is there CPCS/CSCS?
-
Is there Lifting operations?
-
Is there Quick Hitch?
-
Is there Slinger/Banksman?
-
Is there Street Works?
-
Is there Face Fit Testing?
-
Is there Abrasive wheels?
-
Manual Handling?
12. Environment
12.1. Waste
-
Is waste management compliant?<br><br>- waste plan in place<br>- waste segregated<br>- WTN's/consignment notes compliant for waste removed from site<br>- waste carriers/transfer stations/landfill tips licensed
-
12.1.1. Is there a waste plan in place?
-
12.1.2. Is waste segregated?
-
12.1.3. Are WTN's/consignment notes compliant for waste removed from site?
-
12.1.4. Are waste carriers/transfer stations/landfill tips licensed?
12.2. Pollution Prevention and Control
-
Is PPC measures compliant?<br><br>- measures suitable and sufficient<br>- spill prevention/containment measures in place<br>- requisite licenses, registrations, exemptions in place
-
12.2.1. Are pollution prevention measures suitable and sufficient
-
12.2.2. Are there adequate spill prevention measures in place?
-
12.2.3. Are requisite licenses, registrations, exemptions in place?
13. Other
-
13.1. Are there any issues posing an immediate significant risk to health and safety? (If yes, what immediate action has been taken?) (Note : 'yes' subtracts 10 from score)
-
13.2 Are there any other issues which may result in non compliance or non conformance and which do not carry a significant risk to health and safety?
-
Item 1
-
Item 2
-
Item 3
-
13.3. Were there any items identified on the site in general and discussed with Site Management? (non ACS)
-
13.4 During safety conversations with operatives on site, were there any concerns or deficiencies raised which may require action or attention?
-
Additional comments
-
Additional photographs
-
Were there any good practices or 'above the line' behaviors noted?
Audit end
-
H&S signature
-
Ganger signature