Information
-
Name
-
Add media
-
Designation
-
Monitor.
-
Designation
-
Office & Control Number
-
Client / Location
-
Client / Location
-
Conducted on
-
Prepared by
Surveys / Inspection undertaken
Surveys / Inspection undertaken. (Note : The Surveyors identified fields of activities should be assessed at least once in every 4 (four) years.) Appropriate evidence must be collected and included within or annexed to this report!
-
New construction - Pressure Equipment / Boilers / Vessels / Pipework / Assemblies.
-
Was this activity covered in the last report?
-
Design Appraisal activities (Specify)
-
Was this activity covered in the last report?
-
iSIS -Pressure systems / Refrigeration / Power Station / Process Plant (Specify type)
-
Was this activity covered in the last report?
-
EC Directive Work E.G. PED / TPED / Machinery / ATEX
-
Was this activity covered in the last report?
-
Welding & NDE
-
Was this activity covered in the last report?
-
Materials / Machinery
-
Was this activity covered in the last report?
-
Administration activities - Review of notebook / Reporting / accuracy of reporting.
-
Was this activity covered in the last report?
-
Other Surveys / Inspections / Specific business stream monitoring requirements (Specify) e.g. Marines, Oil & Gas
-
Was this activity covered in the last report?
-
Container / Tank Inspections -Standards and procedures listed in MS39-00-CCS Rev 3July 2005
-
Was this activity covered in the last report?
-
Other activities - including management and activity monitoring of sub- contract staff
-
Was this activity covered in the last report?
-
Previous findings:<br>(The previous activity monitor has being reviewed and all outstanding actions closed out.)f<br>If NO please identify below:
-
MS02-04-04 app1 R6
(Amended for local UK energy purposes 01-2010
Commercial
Commercial awareness (RFS / contracts)/client interaction
-
Is the Surveyor fully aware of the Clients requirements, including latest applicable amendments, requirements for statutory surveys and the requirements of national authorities? (All as applicable)
-
Is the Surveyor/inspector fully conversant with all the specified requirements for work i.e. Technical notices, guidance documents and contractual requirements etc.
-
Is there a request for services in place?
-
Has a control number been raised with all the correct parameters?
-
Is the individual authorised for work list codes
-
Does the Surveyor have necessary PPE?
-
Is the individuals relationship with the client satisfactory
-
If no identify actions below
-
Is the individuals conduct on the clients premises satisfactory?
-
If no identify actions below
-
MS02-04-04 app1 R6
(Amended for local UK energy purposes 01-2010
Technical
Technical awareness
-
Are welding procedures, specifications together with their supporting procedure qualification records verified by the Surveyor/inspector? Are qualified welder a being used?
-
Is the storage and distribution of welding consumables satisfactorily monitored?
-
Is the Surveyors NDE qualification up to date?
-
Are any measuring instruments used by the manufacturer/repairer been reviewed by the Surveyor/inspector
-
Has this been verified?
-
If no what corrective action has been taken?
-
Has this been recorded (e.g on a pro forma, job control record, visit report, certificate or any other document) and placed on file.
-
MS02-04-04 app1 R6
(Amended for local UK energy purposes 01-2010
Sample Survey
Sample inspections by the Surveyor witnessed by me were :
-
Found to be in order
-
Found not to be in order - recommendation made and suitable corrective actions shown in findings section.
-
No recommendations made
Documentation.
-
Are the reporting documents issued satisfactory, e.g. Checklists, progress reports, job control records etc.
-
Is the individuals performance and competency considered satisfactory for the work undertaken.
-
Is there any evidence that previous training has benefited the individuals performance? If yes give evidence or examples.
-
Is the Surveyor aware of his job description and is it applicable to his role today?
-
MS02-04-04 app1 R6
(Amended for local UK energy purposes 01-2010
Finding and conclusions
Record below all references through the process of the monitoring activity. I.e. Equipment identification, serial numbers, document references, materials, codes/specifications used etc
-
Add media
Monitors/ line managers comments on review
Findings identified which require corrective action.
-
MS02-04-04 app1 R6
(Amended for local UK energy purposes 01-2010
Signatures
-
Monitor
-
Select date
-
Signed as accepted Surveyor /inspector
-
Select date
-
Signed as accepted line manager.
-
Select date
-
Acceptance can be made by confirmation email which will be addended to report.
-
MS02-04-04 app1 R6
(Amended for local UK energy purposes 01-2010