Information

  • Name

  • Add media

  • Designation

  • Monitor.

  • Designation

  • Office & Control Number

  • Client / Location

  • Client / Location
  • Conducted on

  • Prepared by

Surveys / Inspection undertaken

Surveys / Inspection undertaken. (Note : The Surveyors identified fields of activities should be assessed at least once in every 4 (four) years.) Appropriate evidence must be collected and included within or annexed to this report!

  • New construction - Pressure Equipment / Boilers / Vessels / Pipework / Assemblies.

  • Was this activity covered in the last report?

  • Design Appraisal activities (Specify)

  • Was this activity covered in the last report?

  • iSIS -Pressure systems / Refrigeration / Power Station / Process Plant (Specify type)

  • Was this activity covered in the last report?

  • EC Directive Work E.G. PED / TPED / Machinery / ATEX

  • Was this activity covered in the last report?

  • Welding & NDE

  • Was this activity covered in the last report?

  • Materials / Machinery

  • Was this activity covered in the last report?

  • Administration activities - Review of notebook / Reporting / accuracy of reporting.

  • Was this activity covered in the last report?

  • Other Surveys / Inspections / Specific business stream monitoring requirements (Specify) e.g. Marines, Oil & Gas

  • Was this activity covered in the last report?

  • Container / Tank Inspections -Standards and procedures listed in MS39-00-CCS Rev 3July 2005

  • Was this activity covered in the last report?

  • Other activities - including management and activity monitoring of sub- contract staff

  • Was this activity covered in the last report?

  • Previous findings:<br>(The previous activity monitor has being reviewed and all outstanding actions closed out.)f<br>If NO please identify below:

  • MS02-04-04 app1 R6
    (Amended for local UK energy purposes 01-2010

Commercial

Commercial awareness (RFS / contracts)/client interaction

  • Is the Surveyor fully aware of the Clients requirements, including latest applicable amendments, requirements for statutory surveys and the requirements of national authorities? (All as applicable)

  • Is the Surveyor/inspector fully conversant with all the specified requirements for work i.e. Technical notices, guidance documents and contractual requirements etc.

  • Is there a request for services in place?

  • Has a control number been raised with all the correct parameters?

  • Is the individual authorised for work list codes

  • Does the Surveyor have necessary PPE?

  • Is the individuals relationship with the client satisfactory

  • If no identify actions below

  • Is the individuals conduct on the clients premises satisfactory?

  • If no identify actions below

  • MS02-04-04 app1 R6
    (Amended for local UK energy purposes 01-2010

Technical

Technical awareness

  • Are welding procedures, specifications together with their supporting procedure qualification records verified by the Surveyor/inspector? Are qualified welder a being used?

  • Is the storage and distribution of welding consumables satisfactorily monitored?

  • Is the Surveyors NDE qualification up to date?

  • Are any measuring instruments used by the manufacturer/repairer been reviewed by the Surveyor/inspector

  • Has this been verified?

  • If no what corrective action has been taken?

  • Has this been recorded (e.g on a pro forma, job control record, visit report, certificate or any other document) and placed on file.

  • MS02-04-04 app1 R6
    (Amended for local UK energy purposes 01-2010

Sample Survey

Sample inspections by the Surveyor witnessed by me were :

  • Found to be in order

  • Found not to be in order - recommendation made and suitable corrective actions shown in findings section.

  • No recommendations made

Documentation.

  • Are the reporting documents issued satisfactory, e.g. Checklists, progress reports, job control records etc.

  • Is the individuals performance and competency considered satisfactory for the work undertaken.

  • Is there any evidence that previous training has benefited the individuals performance? If yes give evidence or examples.

  • Is the Surveyor aware of his job description and is it applicable to his role today?

  • MS02-04-04 app1 R6
    (Amended for local UK energy purposes 01-2010

Finding and conclusions

Record below all references through the process of the monitoring activity. I.e. Equipment identification, serial numbers, document references, materials, codes/specifications used etc

  • Add media

Monitors/ line managers comments on review

Findings identified which require corrective action.

  • MS02-04-04 app1 R6
    (Amended for local UK energy purposes 01-2010

Signatures

  • Monitor

  • Select date

  • Signed as accepted Surveyor /inspector

  • Select date

  • Signed as accepted line manager.

  • Select date

  • Acceptance can be made by confirmation email which will be addended to report.

  • MS02-04-04 app1 R6
    (Amended for local UK energy purposes 01-2010

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.