Title Page
-
Conducted on
-
Prepared by
-
Location
Pre-Job Checklist
-
1) PPE
-
2) Signs/Cones Placed
-
3)Wheels Chocked
-
4) Stretch/warm Up
-
5) Print/Job Review
-
6) Property Damage
-
7) Customer Contacted
-
8) Pre-Task Card Review
-
Recognized Hazards
-
Chemicals
-
Material Handling
-
Pedestrian/Vehicle Traffic
-
Co Vehicle Placement
-
Job Access
-
Underground Utilities
-
Fire/Explosion
-
Sprinkler Systems
-
Propane Tanks
-
Machine Guarding
-
Heavy Equipment
-
Energized Electric
-
Struck By’s
-
Slip/Trip/Fall Hazard
-
Pinch Point/Caught Between
-
Excessive Noise
-
Eye Injury
-
Other
Hazard Protection
-
Hearing Protection
-
High Voltage Electrical Protection
-
Barrier Protection Erected
-
Material Safety Data Sheet
-
Equipment Inspection
-
Tool Inspection
-
Flagger/Traffic Control
-
Discuss Yesterday’s Incidents?
-
Site Safety Orientation Complete
-
Post Job Checklist
-
1) All Excavations Secure
-
2) Customer Equipment Secured
-
3) Signs/Cones Removed
-
4)Truck/Trailer/Equipment Secured
-
5) On Site Equipment Secured
Crew Covered in this plan
Photos:
-
Add media
Other Comments:
-
Notes: