Information
-
ADT178 - A1 Engineering Solutions Ltd - Service Department Vehicle Audit
Vehicle, Engineer and Equipment Check List
-
Audit month
- JANUARY
- FEBRUARY
- MARCH
- APRIL
- MAY
- JUNE
- JULY
- AUGUST
- SEPTEMBER
- OCTOBER
- NOVEMBER
- DECEMBER
-
Engineer Name
-
Registration.
-
Vehicle Make Model
-
Location
-
Vehicle Mileage.
-
Date & time
Section 1
Section 1 - VEHICLE
-
1.1 Van livery displayed with current contact number?<br> - Double click here to add notes / image of vehicle livery
-
1.2 Vehicle parked safely with consideration for the safety of the general public and persons on site?
-
1.3 Van clean and tidy - Externally MOT current<br> - Double click here to add notes / image of vehicle exterior
-
1.4 Van clean and tidy - Internally, Double click here to add notes / image of vehicle interior
-
1.5 Engineer in A1 uniform, ID, CSCS Card?<br>- Double click here to add notes / image of vehicle
-
1.6 Driving Licence - is it valid and up to date?
-
1.7 Is the H&S folder available and in good order?
-
1.8 Is the PPE kit fully stocked and being worn or on board?
-
1.9 Are the wiper blades in good working order ?
-
1.10 Is the Van Ventilation operational?
-
1.11Hazard diamond labels displayed at rear if appropriate?
-
1.12 All lights in good working order ?
-
1.13 Are all tyres in good serviceable condition ?
-
1.14 Is the vehicle oil level acceptable ?
-
1.15 is the windscreen water bottle filled ?
Section 2
Section 2 - Brazing equipment.
-
2.1 Are Brazing lines free from splits and cracks ?
-
2.2 Are the line connections correct and free from jubilee clips ?
-
2.3 Are the test certs available and in date for the Brazing equipment ?
-
2.4 Are the regulators including nitrogen all in good condition ?
-
2.5 Are all Flashback regulators in date?
-
2.6 Are all gas bottles secured and upright in the vehicle ?
-
2.7 Is the fire extinguisher in date and serviceable ?
-
2.8 Is there a bottle trolley in the Van
-
2.9 Is the trolley in good working condition ?
Section 3
Section 3 - ELECTRICAL EQUIPMENT
-
3.0 Power Drill 110v / Battery
-
3.1 18v drill
-
3.2 Angle Grinder 110v
-
3.3 Chop saw
-
3.4 Transformer / extension leads / 110v / 240v
-
3.5 Vacuum pump <br>
-
3.6 Multi function tester
-
3.7 Portable Appliance Testing (PAT) & calibration certs in date for all items listed
-
3.8 Transformer / extension leads / 110v / 240v
Section 4
Section 4 - SITE & HAND TOOLS inc SAFETY SIGNS
-
4.1 Are there adequate small tools available - for the work being undertaken and fit for purpose
- Tool case or bag
- Pipe cutters
-
4.2 Are there adequate safety signs for the work being undertaken - eg Pressure testing / barriers
-
4.3 First Aid kit - in date
-
4.4 Fire Extinguisher - in date
-
4.5 Hand Wash / Eye wash
Section 5
Section 5 - SAFETY EQUIPMENT
-
5.1 Gas Detectors - in calibration
-
5.2 Pressure test Rigs in date and calibrated
-
5.3 Isolation / lock off kits stocked
-
5.4 Coshh for van stock ?
-
5.5 Liquids - secured and contained with supporting COSHH
-
5.6 Spill kits - present
-
5.7 Safety barriers, are they available and in working order
Section 6
Section 6 - PERSONAL PROTECTIVE EQUIPMENT (PPE)
-
6.1 Safety Helmet - Full size - EN397
-
6.2 Goggles - EN166
-
6.3 Ear defenders - Cup type - EN352
-
6.4 Boots - Steel toe cap
-
6.5 Gloves - Traffic lite orange
-
6.6 Gloves - Traffic lite red
-
6.7 Gloves / Gauntlet PVC granular armoured
-
6.8 High visibility coat - EN471
-
6.9 High visibility waist coat
-
6.10 Safety torch
Section 7
Section 7 - CERTIFICATION / DOCUMENTATION
-
7.1 Risk assessments / Method statements
-
7.2 Engineer training certificates - PASMA / FGAS / IPAF / CSCS / ASBESTOS
- PASMA
- Confined Space
- IPAF
- CSCS
- ASBESTOS
- FGAS
-
7.3 Near miss reports
-
7.4 Waste transfer records
-
7.5 H&S Folder, is it on the van and in a good state
Section 8
Section 8 - H&S AWARENESS
-
8.1 Does the engineer understand his responsibilities regarding Health & Safety
-
8.2 Does the engineer demonstrate a good understanding of Health & Safety procedures and current regulations
-
8.3 What was the last Tool Box Talk delivered to the engineer, was a TBT delivered at the time of this audit.
-
8.4 Has the engineer seen copies of safety bulletins
-
8.5 Was the engineer observed working safely and judged to be competent at their job tasks
Summary
SUMMARY, FINDINGS & COMMENTS
-
Engineers comments:
-
Auditors comments:
Sign off
SIGN OFF - acceptance of the summary, findings & comments
-
Engineer signature
-
Auditor signature
-
Add drawing