Information
-
Document No.
-
AGL WTG Kiosk Transformer Inspection
-
The Bluff Wind Farm
-
Oaklannds Hill wind Farm
-
WTG Kiosk Number
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Kiosk Surrounds
-
Gravel thickness OK? No trip hazards?
-
Ground level around Kiosk acceptable?
-
Labelling intact?
-
Paintwork in good conditon?
-
Panels in good condition?<br>
LV 690V side of Kiosk
-
Kiosk doors in good condition?
-
Area clear of dust/vermin?
-
All gland holes filled?
-
All panels fully sealed?
-
Labelling OK?
-
No sign of water ingress?
-
Earthing OK?
-
Other observations?
HV Side of Kiosk
-
Kiosk doors in good condition?
-
Operating tools present?
-
All panels fully secured? All screws present?
-
Panel Interlocks in place?
-
SF6 Gas level OK?
-
Labelling OK?
-
HV Cables free of sharp edges?
-
Earthing OK? No Corroision?
-
No water ingress detected?
-
Other Issues?
Kiosk Transformer Internal
-
Panel door in good condition?
-
No foreign objects left in bund?
-
No oil leaks detected HV side of Tx?
-
No Oil leaks detected LV Side of Tx?
-
HV Cables free of sharp edges?
-
HV Bushings in good condition
-
Gas detection relay OK?
-
Other issues?