H & S Guidance for Reactive & Planned Maintenance & Similar Minor Works The Contractor must complete this risk assessment for all works which are considered M Risk CAT 2. Once completed this assessment must be kept for 12 months, it may be requested as part of an audit by MAB.

  • Client / Site

  • BUN Number (followed by HS)

  • Conducted on

  • Prepared by

  • Brief Description of works:

  • Town

  • Is there a risk of: Working at Height (Difficult access)? (Detail risk and control measure)

  • Risk Level

  • Risk Minimised by:

  • Is there a risk of: Working alone in a remote area? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Working in confined or restricted spaces? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Hot works (Risk of Fire)? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:R

  • Is there a risk of: Hazardous Dust, Fumes or Noise? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Obstruction to Routes or Exits? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Significant risk to customers or staff? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Work involving difficult lifting? (Detail risk and control measure)

  • Risk Level

  • Risk Minimised by:

  • Is there a risk of: Isolation of services? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Isolation of emergency systems? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Is there a risk of: Customers or Staff occupying an area where works are unfinished and a return visit is necessary? (Detail risk and control measure)

  • Risk Level

  • Risk minimised by:

  • Works can be completed safely with existing personnel and equipment?

  • Asbestos Register has been checked, the works will not disturb ACM's (or works are of a type which could never disturb an ACM)

  • If trading, works can be carried out safely whilst premises are trading.

  • Unfinished area is safe for customers or staff to re occupy.

  • Engineer Signature:

  • MAB Representative Signature:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.