Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

C.C documentation

  • Engineering drawings

  • Architectural CC drawings

  • Hydraulic drawings

  • Electrical drawings

  • Fire services drawings

  • Compilation of all CC documentation

  • Lodge CC

  • C.C approved

  • Sign off on section- CC

Workshop details Hangar A

  • Main building frame delivered

  • Detail purlins

  • Mezzanine Steel

  • Office steel

  • Hangar doors

  • PIR Panels

  • Cladding schedule

  • Add signature

Hangar A Steelwork

  • Main frame fabrication Hangar A

  • Purlin production

  • Fabricate mezzanine steelwork

  • Fabricate hangar doors

  • Add signature

SITE SETOUT- FOUNDATIONS HANGAR A

  • Bore and pour piers

  • Form pier caps

  • Place HD bolts

  • Survey check HD bolts

  • Pour pier caps

  • Pier cap curing

  • Add signature

TRANSPORT STEEL-STEEL ERECTION

  • Stand and plumb brace bay

  • Stand and tie intermediate bays

  • Erect office steel and door heads

  • Erect mezzanine steelwork

  • Run purlins and bridging

  • Tune and rattle

  • Grout base plates

  • Add signature

HANGAR A CLADDING

  • Fabricate PIR Panels

  • Transport cool store panel

  • Fabricate cool store panel

  • Roof sheet production

  • Roof sheet delivery

  • Erect PIR panels

  • Erect cool store panels

  • Add signature

HANGAR A ROOFING

  • Erect Roof walls

  • Run safety wire

  • Pin sheets

  • Screw off

  • Gutters and flashings

  • Remove roof rail

  • Add signature

HANGAR A FLOOR SLAB

  • Pit and pipe excavation

  • Place pits and pipers

  • Form and pour internal slabs

  • Form and pour perimeter slabs

  • Add signature

HANGAR A MEZZANINE SLABS

  • Set bondek

  • Form MEZZANINES and stairs

  • Pour stairs and MEZZANINES

  • Add signature

HANGAR A PLUMBING

  • Run subfloor pipes

  • Run external stormwater

  • Install water tanks

  • Plumb stormwater to tanks

  • Plumbing to amenities

  • Fixture to amenities

  • Office facility plumbing

  • Add signature

OFFSITE ELECTRICALS

  • Build distribution boards

  • Add signature

HANGAR A ELECTRICALS

  • Run sub ground cables

  • Deliver and fit distribution boards

  • Run conduits and cables main hangar

  • Hang and connect lights

  • Run ELECTRICALS to amenities/plant/workshop

  • Run electricals to offices

  • Fit out ELECTRICALS amenities/plant/workshop

  • Fit out office ELECTRICALS

  • Add signature

Hangar A Partition Walls

  • Workshop and amenity walls

  • Office walls

  • Add signature

Hangar A Internal finished

  • Tiling to amenities

  • Painting amenities/plant/workshop

  • Painting offices

  • Painting PIR walls

  • Carpet to offices

  • Add signature

Hangar A sliding doors

  • Set upper and lower tracks

  • Hang doors

  • Pack and adjust

  • Add signature

Plant and equipment

  • Install compressor

  • Install waste water treatment

  • Hydronic plumbing

  • Install hydronic system

  • Commissioning plant

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.