Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Planned/Actual
Schedule
-
Planned
-
Actual
Manpower
-
Planned
-
Actual
Equipment
-
Planned
-
Actual
-
Is there an erection plan?
-
Is there an actor bolt survey?
-
Is there a temporary brace plan?
-
Is there a crane location plan?
-
Welder's certifications turned in? Include weld process/training documents.
-
Are reports filled out correctly? Front and back?
-
Do we have a concrete letter?
-
Do we have copies of load tickets?
-
Are proper rigging inspections being done daily and documented?
-
Are bolt tests completed?
-
Is there a record of connector training?
-
Is there a record of plumb report?
-
Is there a record of manlift training?
-
Has the schedule been reviewed?
-
Have manpower/equipment needs been reviewed?
-
Has the labor cost report been reviewed?
-
Has jobsite safety been reviewers?