Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Has been instructed that WPS' and current welding consumable Certificates of Conformance are on site.
-
Current Copy of WPS
https://www.dropbox.com/s/1ycv460nwql4wqv/DSEC%20WPS%20Complete.pdf?dl=0
Has Been Trained in Proper Weld Consumable Storage
-
All Weld Wire must be stored in a clean dry area
-
All Weld Rod (Stick) can be used within 4 hours of opening Hermetically Sealed Containers.
-
Any weld rod not used within 4 hours of opening the container, must be stored in a Rod oven at 250 degrees. If your Weld rod Oven is not at temperature, see your foreman.
Has been trained in welding inspection
-
Only CERTIFIED Welders are allowed to perform welds. -Please provide a copy of your welders certification card to your Foreman
-
Welders will inspect their own welds in accordance with AWS D1.1 -This includes but is not limited to, the use of weld gauges, and other visual inspections. Foreman have a booklet that will help ensure a proper inspection.
-
Welders have been instructed to place a mark near the completed weld joint, only when welding has been completed, and satisfactorily inspected.
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature
-
Employee Name and Signature