Information
-
Prepared by
-
Conducted on
-
Location
-
Personnel
Job Name & Job Number
Equipment on Project
-
Equipment
- Boom Lift
- Scissor Lift
- Fork Lift
-
Scope(s) Equipment Being Used
- Fireproofing
- Spray Foam
- Waterproofing
- Insulation
- Fire Caulking
Delivery Inspection
-
Was a PDI (Pre-Delivery Inspection) performed?
-
If not, why?
-
If so, was the PDI documented?
-
Add media
Daily Equipment Inspection
-
Operator Manual
-
Wheels, Tires
-
Steering/Brakes
-
Guardrails
-
Fluid Levels
-
Seatbelt or Anchors
-
Outriggers
-
Hoses, Belts
-
Gauges, Controls
-
Boom/Cylinders<br>
-
Horn/Alarms
-
Deck/Basket/Carriage<br>
-
Batteries
-
ROPS (Roll Over Protection Structure)
-
Forks
-
Pins, Bushings
-
Boom, Scissor<br>
-
Any Other Hazards
-
If So, List Hazards<br>
-
Add media
-
Add signature
Worksite Conditions
-
Pedestrians
-
Public Roads
-
Other Contractor Equipment
-
CAZ ( Controlled Access Zones)<br>
-
Barricades<br>
-
Overhead Obstructions<br>
-
Power Lines
-
Material Obstructions<br>
-
Obstructed Vision
-
Slippery Surfaces
-
Slopes, Ramps, Hills
-
Trenches<br>
-
Ruts, Holes
-
Wind, Rain
-
Lighting<br>
-
Narrow Passageways<br>
-
Hazardous Atmosphere<br>
-
Hazardous Materials<br>
-
Any Other Hazards
-
If So, List Hazards
-
Add media
-
Add signature