Title Page
-
Works order number (to be added by Production)
-
NCR Number (to be added by Quality Dept)
-
Date & Time of Incident
NCR REPORT
Shop Floor
-
Part Description
-
Defect Quantity
-
Who Identified the NCR
-
Who made the NCR
-
Operation Number
-
How was the NCR found?
-
Where did the NCR occur - (Machine)
- NTX
- L300
- L400
- SL35
- DSG
- XYZ
- Manual Lathe
- Assembly
- Subcontractor
- Supplier
- Goods in/Dispatch
- Hurco
- Manual Milling
- CMM
- Inspection
- CNC Grinder
- Manual Grinder
- Surface Grinder
- Ring Grinder
- Lapping Machine
- Honing Machine
- Springfield
- Office
-
What is the defect / issue?
-
Please add supporting pictures
-
What caused the defect to occur?
-
Place part in the quarantine area and identify with works order number via red tag if possible
-
Sign off as production section complete
Office
-
Following sections to be completed in office
-
Issue entered into Javelin
-
Customer
- Baker Hughes
- Cameron AL Rushaid
- Cameron Barrow
- Cameron Canada
- Cameron France
- Cameron International
- Cameron Italy
- Cameron Malaysia
- Cameron Mexico
- Cameron Mid East
- Cameron Norge
- Cameron Romania
- Cameron Singapore
- Cameron Onesubsea
- Emerson
- Fisher Controls
- In Line Valve
- Koso Kent Introl LTD
- M-Flow Tech
- OneSubsea Diamould
- Roota
- Schlumberger Canada
- Seven Unival
- Score Europe
- Trillium Flow Technologies
- Vault Pressure Control
- Vetco Gray
- Al-Met Stock Part
-
Please add the NCR number to the beginning of this report
-
Disposition
-
What material is scrap?
-
Agreed actions carried out by the production team
Investigation & Corrective Actions
-
Has the investigation been carried out?
-
What was the outcome of the investigation?
-
What was the cost of Quality for this NCR? (to the nearest GBP)
-
Has a corrective action been agreed?
-
What is the agreed corrective action?
-
Why has no corrective action been submitted?
-
Sign off as NCR investigation complete