Information
-
Lot no and street
-
Conducted on
-
Prepared by
Site condition/ risk assessment
-
Take at least 4 photos of site and neighbouring properties.
-
Is the grass overgrown does it exceed 100 mm ?
-
Take a photo
-
Is there any rubbish to be taken away?
-
Take a photo Supervisor to quote cost of rubbish removal. 1truck mixed rubbish =$990 inc 1 truck clean fill =$770 inc
-
Is the site safe in its current form?
-
Document the hazard, take a photo and implement control measures.
If you are not sure of what control measures apply speak to the construction manager. -
Are there any steep slopes, water ways,wildlife ie snakes or any other hazards to consider during construction?
-
Document the hazard, take a photo and implement control measures.
If you are not sure of what control measures to apply speak to the construction manager.
Re establishment assessment
-
Can you locate a minimum of 3 un disturbed pegs on the block?<br>Tick the pegs you have found.
-
Front left
-
Front right
-
Back left
-
Back right
-
Is any part of the proposed house located on the boundary (zero boundary,re establishment required) <br>Note: if 200mm off set click on No.
-
Do we need a works protection notice, or do we need to pull down a fence in order to build a garage wall.
-
Knock on the neighbours door, introduce yourself and company. Ask if they are the owner. If not ask for the managing agent. Explain what you would like to do with the boundary fence. Explain the advantages to them of pulling down the fence and building a clean brick wall. Leave your number and card should they have any issues during construction. If for whatever reason you can not get them to agree, see the construction manager.
-
With our proposed levels, Will we undermine any part of the neighbouring properties.
-
Speak to construction manager.
Estimating
-
Please specify which boundaries will require temp fencing.
- ALL sides
- front side
- left side
- right side
- back
-
Will there be any special OH&S notes required on purchase orders
- NO special comment
- school nearby
- high traffic area
- high pedestrian traffic area
- low low overhead electrical cables
- dense shrubs
- snakes known to be in local area
- waterway nearby
-
Do any extra orders for brickys apply
- no extras required
- cartage 2 sides
- cartage 3 sides
- laying overhand
Foot path and crossover condition
-
Does the crossover line up with the site plan crossover?
-
Confirm with drafting of crossover location and or cross check supporting documentation.
-
Spray paint any visible cracking or damage to footpath - Then take a minimum of 4 photos of footpath,crossovers and curbs and channels.
-
Please specify any damage, cracks, hairline cracks, or chips to footpath bays, crossover and or curb and Chanel.
-
Is the electrical pit broken and could become dangerous?
-
Does site have water tap in
Action items
-
Supervisor will ensure the site is safe before work starts
SIGN OFF
-
Supervisor
-
Email CSR completed form. Ensure that you list lot number and address in subject field of your email.